Heygon Araújo
Werdegang
Berufserfahrung von Heygon Araújo
- Bis heute 4 Jahre und 10 Monate, seit Jan. 2021
Locomotive Engineer
Vale
- Business reporting, dashboarding and analysis (e.g. by using SAP Analytics Cloud) - Implement statistics analysis, for instance by using hypothesis testing, for Marketing Campaigns and Order Entries. - Develop routines to improve data reliability, efficiency and quality. - Quality checks in the Data Warehouse and Transactional System.
- 1 Jahr und 3 Monate, Feb. 2018 - Apr. 2019
Rolling Stock Maintenance Supervisor
Vale SA
- Led a team of 25 mechanics dedicated to ensuring the lofty reliability of a fleet with 20k rail wagons. - Wagon’s Reliability rose significantly by 36% (in millions of kilometers between failure) - Reduction of 18.75% in defects caused by rework
- 1 Jahr und 4 Monate, Okt. 2016 - Jan. 2018
Senior Planning Engineer
Vale SA
- Designed a simulation model by using Arena and Data Analytics to forecast Vale’s Iron Ore Supply Chain Capacity in the Northern Corridor, coming to 99.8% of precision. - Optimized Locomotives Allocation Program of S11D Project by using forecasting models and making trade-off between different suppliers, leading to a saving of at least US$ 37,2 MM. - Simulated "what-if" questions and support making decisions for S11D Scope Review and Optimization reaching more than R$ 1 billion in savings.
- 5 Jahre und 9 Monate, Jan. 2011 - Sep. 2016
Senior Maintenance Engineer
Vale SA
- Noticeably increasing of 20.8% in the maintenance team productivity. - Develop Computational Vision, Image Processing algorithms and Machine Learning to detect defects in rail wagons components, reaching 83.04% of accuracy. Link - Using lean thinking and standardized work, consumption of maintenance material declined by 27% in 1 year, leading to R$624k in savings.
- 2 Jahre und 8 Monate, Sep. 2011 - Apr. 2014
Planning Engineer
Vale SA
- Led strategic analysis regarding fuel freight trains schedule in order to avoid catastrophic failures on railroad operations. This analyses reduced an estimated US$21.7 million dollars of monthly losses from traffic congestion delays; - Successfully completed a project which aimed to attest to a technical Norm (the Union Internationale Des Chemins de Fer. UIC 406) for mixed-traffic railways, which recommend 60% as an operational efficiency factor.
- 1 Jahr, Jan. 2010 - Dez. 2010
Trainee
Vale SA
Assist in strategic activities of logistical planning in a long-term horizon of the company, such as computer simulation of railway capacity using the Extend software.
Sprachen
Portugiesisch
Muttersprache
Englisch
Fließend
Deutsch
Grundlagen
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.