Ekium
Bérim through Ekium, Commissioning phase for Water Treatment Plant (WTP) project. SIAAP is the water treatment government body of Paris area. SIAAP, as the client, had called on subcontractors for the revamping of its major WTP (2nd world largest). Bérim belongs to a partnership to approve execution work. KEY RESPONSIBILITIES: - Approval of technical doc - Punch list completion with Client and subcontractors KEY ACHIEVEMENTS: - 1100 punch list created & 1600 punch list completed
- 9 Monate, Okt. 2015 - Juni 2016
Freelance Electrical Engineer
Technip
Technip through TBAI, BED for extensions of Oil&Gas Plants. ADISSEO client sent call for tenders to produce methionine. I work on the BED phase for an extension of an Oil&Gas Plants. KEY RESPONSIBILITIES: - Quantities and cost for the electrical material and manpower. - Integration of the new equipment. - Coordination with client and engineering in Spain. KEY ACHIEVEMENTS: - Finalising the BED phase before deadlines and starting the FEED in advance. - Good appreciation from my hierarchy.
- 7 Monate, Dez. 2014 - Juni 2015
Construction Supervisor & Project Engineer
Schneider Electric
Schneider-Electric (France) through Euptech, 63kV Substation Construction of a 63kV substation (2x20 MVA transformers) + implementation of electrical equipment. KEY RESPONSIBILITIES: - Project follow-up during engineering and construction phases - Coordinate client/contractors and provide technical assistance KEY ACHIEVEMENTS: - Approval of FAT and of completion schedule phases - Technical documentation approval
- 5 Monate, Juli 2014 - Nov. 2014
Technical Leader
Schneider Electric
Schneider-Electric (France) through Vulcain, Shore Connection. Ferries on shore are powered by the Grid with a shore connection system (2 MVA transformer). This project scope mostly concerns modification and equipment installation on 3 ships. KEY RESPONSIBILITIES: - Project follow-up during engineering and construction phases - Coordinate client/contractors and provide technical assistance KEY ACHIEVEMENTS: - Approval of FAT and of completion schedule phases - Technical documentation approval
- 8 Monate, Mai 2013 - Dez. 2013
Electrical Engineer
Technip
Technip (Australia) through Dare Recruitment, FEED for LNG Offshore Gas Platform (OGP) Wheatstone project is an OGP owned by Chevron and designed by Technip. I worked in the electrical detailed design phase. KEY RESPONSIBILITIES: - Cable sizing, comments and review of technical doc. - Electrical asset data for all offshore platform packages. - Deal with client requirement and other engineering offices (Daewoo Shipbuilding & Marine Eng.) KEY ACHIEVEMENTS: - Completion of my assigned tasks.
- 3 Monate, Feb. 2013 - Apr. 2013
Project Engineer & Construction site Supervisor
Cardno
Cardno-BEC (Australia and Côte d’Ivoire), FEED & EXE phase for Mining project Cardno-BEC manage the contractors for the construction of the 90kV overhead power line + 90/11kV substations to energize a gold mine facilities. KEY RESPONSIBILITIES: - Follow up of the schedules, budgets and deliveries with Bouygues with client’s requirements - Coordination of the local staff KEY ACHIEVEMENTS: - Improvement of the exchanges between Bouygues and Cardo-BEC. - Approval of the documentation.
- 1 Jahr, Sep. 2011 - Aug. 2012
Electrical Design & Project Engineer
WorleyParsons
Worleyparsons (AUSTRALIA) through Fircroft, Various Oil & Gas and Mining projects KEY RESPONSIBILITIES: - Electrical technical documentation design of kiosk & small substation and calculations (cable size, AC/DC load,…) in accordance with Australian Standards especially in LV distribution - Project management & define workload - Supervise and provide assistance to drafting staff KEY ACHIEVEMENTS: - Ability to solve long standing technical issues - Write and approve technical documentation
- 7 Monate, Sep. 2010 - März 2011
Design Electrical Engineer
Areva
AREVA - SGN (FRANCE) through MCA Ingénierie, Uranium Enrichment Facility (UEF) EREF project (USA) is based on the design of the French UEF Georges BESSE 2 KEY RESPONSIBILITIES: - technical documents. - European, American and French standard and difference of voltage level / frequency. - Follow strict specification nuclear field. KEY ACHIEVEMENTS: - Submited electrical specifications and drawings for the project. - Good integration and improvement of communication between in US and in France.
- 1 Jahr, Aug. 2009 - Juli 2010
Electrical System Engineer
Technip
Technip (Malaysia), FEED for Nickel Ore Mining Utilities Technip and Hatch has the EPCM for Koniambo Project in New Caledonia KEY RESPONSIBILITIES: - Coordination of the local Malaysian drafters, New Caledonian suppliers and teams on site. - Design & calculation of electrical network (HV: 33kV - LV: 230/410Vac, 690Vac). - Technical assistant KEY ACHIEVEMENTS: - Qchievemnt of the project in the electrical field. - Designed versatil equipments to provide cost efficiency.
- 1 Jahr, Aug. 2008 - Juli 2009
Commissioning Electrical & Control Systems Engineer
Technip
Technip (Vietnam), EXE & Commissioning for Oil and Gas Refinery Technip, leader in a consortium, has been awarded by Petrovietnam for the EPCM of Vietnam’s first oil refinery. KEY RESPONSIBILITIES: - Trouble shooting and check interface communication with EMCS, DCS and material on the electrical network in 22kVac, 6.6kVac, 690Vac and 410Vac. - Technical assistant. KEY ACHIEVEMENTS: - Starting of the EMCS and significant progress on the EIA. - Understanding of the recurrent problems.
- 7 Monate, Jan. 2008 - Juli 2008
Construction Electrical Engineer
Technip
Technip (Vietnam), EXE & Commissioning for Oil and Gas Refinery Technip, leader in a consortium, has been awarded by Petrovietnam for the EPCM of Vietnam’s first oil refinery KEY RESPONSIBILITIES - Coordination for elect. installation & equipment connections - Rectify upstream problems and spec of the engineering - Construction works: supply of material, anticipate & prepare area KEY ACHIEVEMENTS - Elect. installations implementation - Monitoring the construction work, As-Built drawings
- 8 Monate, Mai 2007 - Dez. 2007
Electrical & HSE Engineer
Technip
Technip (Vietnam), EXE & Commissioning for Oil & Gas Refinery Technip, leader in a consortium, has been awarded by Petrovietnam for the EPCM of Vietnam’s first oil refinery. KEY RESPONSIBILITIES: - Inspect elect. equipments, analyze incidents & submit report - Use of local elect. team to standardize the equipment - Keep watch of the HSE rules & make people aware of the dangerousness of electricity. KEY ACHIEVEMENTS - Improve temporary elect. installation - Installed temporary elect. network
Ausbildung von Igor DE GLADKY
- 3 Jahre und 1 Monat, Sep. 2003 - Sep. 2006
Electrical Engineering
ESIEE
Master Degree in Electrical and Control Systems Engineering (power generation, distribution and systems analysis) from ESIEE-Amiens (School of Engineering in FRANCE). Project: Surveillance and Control Access System for a Laboratory
- 1 Jahr und 1 Monat, Sep. 2002 - Sep. 2003
Electronics Engineering
Oxford Brookes University
Bachelor of Engineering (BEng) in Electronics from Oxford Brookes University (UK) Syllabus in Telecommunication, VHDL, Analogue & Digital Electronics. Project: Conception of a High Speed Current Feedback Operational Amplifier
Sprachen
Französisch
Muttersprache
Englisch
Fließend
Spanisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.