Kshitiz Agarwal

Angestellt, Site Service Director, Mitsubishi Hitachi Power Systems Europe
Dublin, Irland

Fähigkeiten und Kenntnisse

Turbine
Gas Turbine
Risk and Reliability Assessment of Gas Turbines
Gas Turbine Performamce
combined cycle
Project management
Project Development
Project financing
Gas Turbines
Project

Werdegang

Berufserfahrung von Kshitiz Agarwal

  • Bis heute 7 Jahre und 3 Monate, seit Apr. 2018

    Site Service Director

    Mitsubishi Hitachi Power Systems Europe

  • 2 Jahre und 9 Monate, Aug. 2015 - Apr. 2018

    Project Support Engineer

    Mitsubishi Hitachi Power System Europe

    • Responsible for the Huntstown and Great Island Long Term Service Agreements. • Handling operational issues and emergencies, as being the single point entity between the customer and MHPS group for the commercial, field service and engineering perspectives. • Responsible to plan, budget and execute all planned and unplanned outages and maintain the respective LTSA budget. • Acting as the sale force representative for new flexibility items and acknowledge requests from the customer.

  • 2 Jahre und 1 Monat, Aug. 2013 - Aug. 2015

    Mechanical Engineer

    Hansworth Limited

    • Responsible for the technical aspect of 2800 MW Ethiope Energy Project and Combined Cooling Heat and Power (CCHP) Abuja Housing Estate Project. • Accounted for co-supervising feasibility studies, developing Heat Balance Diagrams with the help of Thermoflow, selecting the technology and preparing the conceptual design. • Providing technical support to the in-house procurement team for ongoing NIPP projects. • Carried out Gap Analysis between Alaoji Phase 1 (i.e. SCPP) and Alaoji Phase 2 (i.e. CCPP).

  • 1 Jahr und 1 Monat, Sep. 2010 - Sep. 2011

    Lead Project Engineer

    Gamma Infra Prop. Pvt. Ltd., New Delhi, India

    • Headed a small team of 10 members which was responsible for the installation of the power plant. • Planned project schedules and supervised Mechanical Contractors at site and also conducted welding test in 3G Position. • Co-supervised the work of Assistant Engineers, Technicians and other staff members while directly reporting to the Vice – President of Projects.

  • 6 Monate, Apr. 2010 - Sep. 2010

    Graduate Trainee Engineer

    Kessel Engineering Pvt. Ltd

    • Liaised with customers and suppliers. • Developed the Heat Balance diagram and also planned the project schedule, while being responsible for the financial matters and export documentations.

Ausbildung von Kshitiz Agarwal

  • 1 Jahr, Okt. 2011 - Sep. 2012

    Thermal Power (with an Option of Gas Turbine Technology)

    Cranfield University

    Main Subjects Include: Gas Turbine Theory and Performance, Combustors, Turbomachinary, CFD, FORTRAN, Mechanical Design of Turbomachinery, Blade Cooling, Simulation and Diagnostics. Group Project: - Preliminary Redesigning of GE F118-100 Thesis: - Risk Based Assessment of Industrial Gas Turbine

  • 4 Jahre und 5 Monate, Nov. 2005 - März 2010

    Power engineering

    RTMNU

    Power Generation Technology, Steam Turbine and its Auxiliaries, Steam Generators and its Auxiliaries, Power Plant Operations, Power Plant Maintenance, Power Plant Commissioning. Generator and its Auxiliaries. Thesis: Study of Economic Load Dispatch and Pollution Control Optimization

Sprachen

  • Englisch

    Fließend

  • Hindi

    -

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z