Martien Versleijen

ist gesund und munter. 🥦

Angestellt, Manager Technical departments, Q-railing Europe GmbH & Co. KG
Emmerich, Deutschland

Fähigkeiten und Kenntnisse

Mechanik
Engineering
Design
Prototyping
Produkt

Werdegang

Berufserfahrung von Martien Versleijen

  • Bis heute 11 Jahre und 11 Monate, seit Sep. 2013

    Manager Technical departments

    Q-railing Europe GmbH & Co. KG
  • 5 Jahre, Sep. 2008 - Aug. 2013

    Engineer assembly and testing

    Weir Minerals

    -Develop, design, purchase and implement improvements and tools for assembly and testing of slurry pumps. -Arrange tools for setup of assembly proces in China (on location). -Writing of assembly procedures for chinese colleagues. -Assist chinese colleagues in startup of assembly proces.

  • 1 Jahr und 7 Monate, Feb. 2007 - Aug. 2008

    Head design engineering New Parts Manufacturing

    Sulzer Turbo Services Venlo BV

    Lead a team of design engineers in reverse enginering of turbine components (hot parts) with NX/Unigraphics.

  • 1 Jahr und 3 Monate, Nov. 2005 - Jan. 2007

    Design Engineer

    Reell Precision components

    -Develop and design client specific solutions in the field of constant torque hinges and wrap spring clutches. -Building of prototypes -Trouble shooting on production equipment

  • 4 Jahre und 7 Monate, Apr. 2001 - Okt. 2005

    Senior Mechanical R&D Engineer

    Thales Munitronics

    Responsible for new designs and improvements on reserve batteries (used in ballistic grenades). Lead a team of mechanical and electronics engineers during projects concerning: -Developing and prototyping of Lithium reserve batteries (patent # WO2005093883) -Developing and building of test equipment Consultancy w.r.t. lithium reserve batteries manufacturing plant

  • 1 Jahr und 5 Monate, Nov. 1999 - März 2001

    Engineer R&D

    DAF Trucks

    Designing and releasing of new and existing truck components

  • 4 Monate, Juli 1999 - Okt. 1999

    Consultant /trouble shooter

    Ritter automotive

    -Perform a work-flow analysis on a newly installed work cell. -Develop and create a Standard Operation Procedure for lubrication of a large production line

  • 2 Monate, Mai 1999 - Juni 1999

    Mechanical Designer

    Dinnissen

    Design powder processing machine.

  • 4 Jahre und 2 Monate, Apr. 1995 - Mai 1999

    Equipment Engineer

    Océ Printing Systems

    Designing, drafting, factory- and site acceptance of: -product transportation and handling machinery in cleanrooms. -equipment for use in Physical Vapour Deposition proces Planning and budgetting of beforementioned.

Sprachen

  • Deutsch

    Fließend

  • Niederländisch

    Muttersprache

  • Englisch

    Fließend

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z