Musa KIRCI
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Musa KIRCI
- Current 8 years and 7 months, since Nov 2017
Project Manager
USTAY
Azerikimya EP300 Propylene and Ethylene Unit - Modernization Project -EP300 Propylene and Ethylene Unit -PSA Unit -Center Control Building -RDG-Substation Building -Storage Substation Building -Refinery Dry Gas Treatment Unit -Storage Laydown Area and Bullet Area -Interconnecting Pipe racks
- 1 year and 8 months, Apr 2016 - Nov 2017
Project Manager
DEMA
Revamping of U‐7000 Crude Oil Unit and Installation of 3 heaters. ‐ Installation of Crude Oil Heaters, ‐ Demolishing of Existing Crude Oil Heaters, ‐ Revamping of Stripping Columns (Pre‐Flash Tower, Atmospheric Distillation Tower, Kerosene Tower, LT & HV Diesel Tower, Stabilizer Tower, Absorption Tower) ‐ Installation and demolishing of process piping,
- 2 years, May 2014 - Apr 2016
Project Manager
CGS
CGS, Severstal, Ruetgers‐ Tar Distillation Plant‐ Cherepovets, Russia ‐ Tar Distillation Plant, ‐ Utility Pipe Rack, ‐ Air Cooling Unit, ‐ Process Columns,
- 1 year, Jun 2013 - May 2014
Project Manager
Renaissance Heavy Industries
TR, Volgograd, RUSSIA. ‐ Lukoil VGO Deep Conversion Complex Refinery Project. ‐ H2 Production Unit (Reformer) ‐ CSPU Unit,
- 1 year and 1 month, Jun 2012 - Jun 2013
Project Coordinator
Renaissance Heavy Industries
‐ Mary Fertilizer Project, Mary, Turkmenistan, ‐ Ethylene Cracker Project in Tobolsk, Russia, ‐ Rusvnyle PVC Project, Nijni Novgorod, Russia, ‐ Acrylic Acid Project, Salavat, Russia, Direct assisting, supporting and reporting to the COO. Generating and managing of EPC projects.
- 1 year and 1 month, Jun 2011 - Jun 2012
Project Manager
Emerson Process Management AG
Istanbul, TURKEY and Stirling, Scotland, UK. ‐ Tupras İzmir Refinery Metering Skid Project, ‐ Statoil Metering Skids Refinery Project, ‐ Saipem London Metering Skid Project, ‐ Aberdeen Technical University Metering Skid Project,
- 1 year and 3 months, Apr 2010 - Jun 2011
Project Manager
TUPRAS
‐ 8000 Nm3 /h Furnace Upgrade Project, ‐ Replacement of old hydro‐cracking reactors and revamping of existing heaters, ‐ H2S stripper column service change, ‐ New HDPE Fire Fighting Line Project ad New Pump Room, Co‐ordinate the efforts of the construction team to meet project requirements.
- 1 year and 11 months, May 2008 - Mar 2010
Construction Manager
GAMA Industry Qatar WLL
Shell Qatar Pearl GTL Project, ($250.000.000), Ras laffan, Al Khor, Qatar, Associated with Linde AG Client Shell Qatar. ‐ Air Separation Units, ‐ Machine House Units and Turbines, ‐ Cold Box, Hex Box and DCC tanks area, ‐ O2 and N2 Tanks Areas, ‐ Reactors,
- 10 months, Aug 2007 - May 2008
Construction Manager
GAMA Industry Arabia Ltd.
Affilitative Company of Gama Industry A.S. located in Saudi Arabia ACC Rabigh Cement Plant Project with 7000 tons/day capacity new clinker line ($150.000.000), Rabigh, Kingdom of Saudi Arabia Client Arabian Cement Company ‐ Rotary Kiln, ‐ Cement Mill, ‐ Clinker Production Unit, ‐ Pre‐ heater Tower, ‐ Natural Gas Pressure Drop station and Pipe Lines, ‐ Cooler, ‐ Raw Mills Unit,
- 2 years and 3 months, Jun 2005 - Aug 2007
Construction Manager
GAMA Industry Arabia Ltd.
Affiliative Company of Gama industry A.S. located in Saudi Arabia, Yamama Cement Plant Project with 10000 tons/day capacity new clinker line ($190.000.00), Riyadh, Kingdom of Saudi Arabia, Associated with Polysius AG Client Yamama Cement. ‐ Rotary Kiln, ‐ Cement Mill, ‐ Clinker Production Unit, ‐ Pre‐ heater Tower, ‐ Natural Gas Unit and pipe lines, ‐ Tanks Area, ‐ Cooler, ‐ Transfer Tower, ‐ Raw Mill,
- 1 year and 10 months, Sep 2003 - Jun 2005
Project Piping Manager
GAMA Industry Arabia Ltd.
Berri Gas Plant Project ($210.000.000), ‐ Al Jubail, Kingdom of Saudi Arabia Main Contractor: TECHNIP, CLIENT: Saudi ARAMCO ‐Sleeper Way and Transfer Pipe Line Projects, ‐Knock‐ out drum, filters and flare area with stack, ‐Propane Unit and Utilities Pipe Racks for the plant, ‐Compressor Unit and Chiller Units, ‐SRU Units (2 Units in Revamping and 3 New Units in Segregated Areas) ‐Sweetening System, ‐Storage Tanks and Loading Pumps,
- 1 year and 1 month, Jun 2001 - Jun 2002
Project Piping Engineer
ENI‐SAIPEM S.P.A
Blue Stream Project ‐ Samsun, TURKEY ‐ Preparation of Spools on the Plant, ‐ Installation of the pipes under the Black Sea, ‐ Compressor Station,
- 1 year and 1 month, Jun 2000 - Jun 2001
Project Engineer
ASSAN ALUMINIUM
‐ Installation of heaters, ‐ Installation of Cooling Tower Preparing Projects Documents Maintenance and repairing of machines and using them in new projects.
Ausbildung von Musa KIRCI
- 1996 - 2000
Department of Mechanical Engineering
YILDIZ Technical University
Sprachen
English
C2 (Verhandlungssicher / Muttersprachlich)
Russian
B1-B2 (Gute Kenntnisse)
Turkish
C2 (Verhandlungssicher / Muttersprachlich)
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.