
NAKKA VINAY KUMAR
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von NAKKA VINAY KUMAR
- Bis heute 1 Jahr und 6 Monate, seit Feb. 2024
Specialist
LTTS
- 1 Jahr und 2 Monate, Jan. 2023 - Feb. 2024
Team Leader
Tech
- 8 Monate, März 2022 - Okt. 2022
GPO, ANALYST ELECTRICAL ENGINEER
Whirlpool
GPO Analyst Electrical Engineer - Responsible to review and understand project requirement/ problem/design requirement - Creating C3 and above level Harness models and Drawings using Pro Cabling - Creo, Knowledge & usage of Creo schematics - Wire, terminal, component selection. Adhering to Tier II governance and roadmap. - Define routing layout by understanding assembly and safety requirement and other manufacturing process. - Ensure the design(s) developed meet the DFX and other DVP&R Attributes.
- 3 Jahre und 11 Monate, Mai 2018 - März 2022
Lead Analyst CAE
Tech Mahindra
- Leading UI and Electrical Subsystem Interactions/Interfaces - Creating Wiring Schematics using CREO(SCHEMATICS) - Creating Artefacts and connectors by referring specs from suppliers - Electrical wire harness concept and design for FISHER & PAYKEL products - Creation of 3D CREO Cabling Harness, Manufacturing flat file and drawings. - Responsible for Onsite coordinator and deliverables to client - Worked in CATEPILLAR SOLAR TURBINES on concept and detailing routing of harness included multiple variants
- 3D design of electrical wire harness routing at pin level configuration for heavy engineering trucks, tractors, construction and forest engineering vehicles using PRO-E(pro-cabling) - Creating Schematics using Capital Harness Logic, generative design using Capital harness Integrator and detailed, validated harness manufacturing harness designs using Capital Harness XC
- 2 Jahre und 6 Monate, Apr. 2012 - Sep. 2014
Design Engineer
Mahindra Satyam
- Concept Design and Development for Airbus A350 -Implementation of Primary and Secondary design (DMU) complete -Customization of the A-350 as per Modification proposals (MOD/MP), Standard and Optional equipment -Worked for the new process of Customization of the A380 in Custo Co Re project, Implementation of Custo CoRe, DMU Clash analysis -Worked extensively on harmonizing the design process for both SIH and FIH installation
- 4 Jahre und 3 Monate, Juni 2007 - Aug. 2011
Software Developer
Satyam Computer Services Ltd
-Creation and modification of Manufacturing (L929) and Installation (L928) drawings using Catia V4 and VPM database -Creation of 2D drawings related to the Electrical Harness for WAVE 1 projects -Incorporating design changes raised through Design query notes DQN) & Technical Repercussion Sheets (TRS), Non-Conformities (NC) into Mockup -Worked on Fixed Bracket Proposal and Interface Point (IP‘s) request - Preparation of technical reports for the new proposals, queries and calculations
Ausbildung von NAKKA VINAY KUMAR
- 3 Jahre und 8 Monate, Okt. 2003 - Mai 2007
Mechanical Engineering
Jawaharlal Nehru Technological University, Hyderabad
Sprachen
Deutsch
Grundlagen
Englisch
Muttersprache
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.