
Mag. Nadezhda Pokryshko
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Nadezhda Pokryshko
- Current 5 years and 9 months, since Sep 2020
Lead QC engineer
China CAMC engineering co. Ltd.
- 1 year and 10 months, Nov 2018 - Aug 2020
Incoming Control Inspector
BT Group
Quality control of material and static and rotating equipment; system packages (Boilers, Air and nitrogen generation plants) to KMD drawings, bill of materials, quality certificates. Monitoring of delivered on site material and equipment on weekly basis for inspection. Preparing acts of incoming control and carrying out Incoming control register-log. Amur Gas Processing Plant Project (AGPP)
- 7 months, May 2018 - Nov 2018
Lead QC Engineer
I-Teco JSC
• Visual inspection of Electric equipment for Telecommunications; • Preparation as-built documentation and filling in the Incoming control Log; • Check in the Bills of Quantity with the approved design documentation; • Collaboration with Customer Supervisors. Works in the project: «Re-construction (device) of the multifunctional complex with underground parking» (Evolution Tower, Moscow-City)
- 1 year and 9 months, Sep 2016 - May 2018
QC Engineer
Zapolyarpromgrazhdanstroy, LLC
• Works with Russian and international codes and standarts (GOST, SNIP, ASME, API); • Preparation as-built documentation (Acts of incoming control for process piping, valves, welding materials); • Check and control preparation of as-built documentation; • Check material certificates for completeness and equipment for compliance with specifications and design • Сarry out the procedure of the incoming inspection of materials and equipment
- 11 months, Aug 2015 - Jun 2016
Lead As-Built Engineer
MorGasService, LLC
* Working with Russian technical codes and standarts; * Review of design documentation; * Development operating process charts; * Preparation and check out of as-built documentation; * Interaction with Customer’s Supervision department; * Control of performance construction schedule; * Business correspondence with Subcontractors.
- 1 year and 2 months, Jul 2014 - Aug 2015
Design Supervisor
Swiss Engineering Group, LLC
• Analysys design documentation presented by contractors and subcontractors; • Control of design documentation (field pipelines linear part); • Control of incoming technical design documentation for compliance to Uzbekistan standards and international standards; • Verification of quantities bills, materials data sheet and equipment; • Preparing daily and weekly reports and providing the information to Customer's Manager.
- 1 year and 3 months, May 2013 - Jul 2014
Lead Engineer of Pipelines sector
SGK-Truboprovodstroy-5, LLC
• Analysis of the project and pipeline operational documentation (long distance and field pipelines linear part); • Verification volume of project works and services; • Preparing executive documentation for add-on construction-and-assembling operations including KS-2, KS-3, M-29 forms; • Interaction with Customers, General Designers and Subcontractors.
- 9 months, Aug 2012 - Apr 2013
Design Pipeline Engineer
VNIIST, JSC
• Design of the linear part oil and gas field pipelines; • EDM development, pipeline right-of-way (the ROW project); • Initial data collection for the development of design documentation; • Interaction with equipment and materials Suppliers and Vendors; approving equipment and materials with the Customer; • Interaction with Project groups; • Settings the tasks for joint design groups.
- 1 year and 2 months, Jul 2011 - Aug 2012
Lead As Buit Documentation Engineer
LENGAZSPETSSTROY, JSC
* Forming set of permit documentation for construction; * Working with technical documentation standards; * Analysis and verification of design estimate documentation; * Drawing up technological and pipeline schemes; * Business correspondence with the Customer, General Contractor and Subcontractors; * Preparing executive documentation for add-on construction-and-assembling operations including KS-2, KS-3, M-29 forms; * Interaction with Drill Blust Engineers; * Archiving.
- 2 months, Apr 2011 - May 2011
Engineer
GIPRONIIGAZ, JSC
* Preparing design documentation for loading pipeline
- 5 years and 6 months, Oct 2005 - Mar 2011
Pipeline Design Engineer
Gazprom designing
* Design of the linear part of gas pipelines; * Development volume of project works and services; * EDM development; * Getting of pipeline projects approval from utilities Owners (Pipeline’s crossing with cables, oil, gas and water pipelines, electric power lines, etc.).
Ausbildung von Nadezhda Pokryshko
- 4 years and 10 months, Sep 2000 - Jun 2005
Design, construction and exploitation oil & gas pipelines
Lomonosov Northern (Arctic) Federal University, Arkhangelsk
Sprachen
Russian
C2 (Verhandlungssicher / Muttersprachlich)
English
C1 (Fließend)
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
