Perhat Gulberdiyev

Angestellt, Master in Public Administration, Columbia University

New York, Vereinigte Staaten

Fähigkeiten und Kenntnisse

Drilling
Workover
Completion
Offshore Driling
Wireline
Mud
Cementing

Werdegang

Berufserfahrung von Perhat Gulberdiyev

  • Bis heute 8 Jahre und 2 Monate, seit Aug. 2016

    Master in Public Administration

    Columbia University

    Currently study Master in Public Administration at Columbia University, New York, USA. Major: Advanced Management and Finance. Thesis: "The BP Oil Spill, Lessons Learned and New Energy Policy for Future Oil Exploration in Developing Countries".

  • 2 Jahre und 1 Monat, Aug. 2014 - Aug. 2016

    Senior Drilling Supervisor (Offshore)

    Zadco/Exxon Mobil

    - Abu-­Dhabi based National Oil Company with ExxonMobil as Shareholder. - Worked as Senior Drilling and Workover Supervisor on MODU Jack-­Up Rig. - Drilled horizontal wells up to 24,000 ft with different types of mud (OBM, NAF, and WBM). - Performed the workover operations: Well Killing & Recovering Old Completion, Re-­entry and Re-­running single and dual completion.

  • 3 Jahre und 4 Monate, Mai 2011 - Aug. 2014

    Senior Drilling Supervisor (Land)

    Halliburton Energy Services

    Halliburton Consulting & Project Management with SAUDI ARAMCO (LSTK Project). Fields drilled wells: Uthmaniyah, Hawiyah, Haradh, and Khurais. Drilled 12,000 ft horizontal, multi-­lateral and tri-­lateral wells with spud mud, KCL polymer & OBM using rock & PDC bits and mud motors. (2,000 horsepower land rig). Supervised day-­to-­day field operations at the Rig Site.

  • 4 Jahre, Juni 2007 - Mai 2011

    Night Drilling Supervisor (Offshore)

    Dragon Oil PLC

    Worked on MODU Jack-­up Rig and Land rig located on the offshore platform. Drilled of Directional and Vertical wells (HP and HT exploration and production wells with 4500m using WBM and PDC bits). Possess a strong coordination with drilling contractors to ensure rig equipment are properly utilized and stored to maximize the rig efficiency and minimize rig downtime. Assisted the senior drilling supervisor in managing the daily well costs (AFE) and utilized the rig resources to cut down the well cost.

  • 5 Monate, Feb. 2007 - Juni 2007

    Operations Manager

    DGTL Group

    Rig moves with Parker Drilling Company and Cargo handling. Supervision of Technical Department, Equipment Maintenance and managed 70 people at work. Develop Company’s Safety Policy and Procedures.

  • 2 Jahre, Juni 2005 - Mai 2007

    Client Relationship Officer

    Schlumberger

    Closely worked with drilling personnel and management of PETRONAS Carigali. Contract Bidding and Pricing, Supervision of daily well site operation, Rig Installation and Equipment Maintenance, Obtaining licenses for Radiation and Explosives, Equipment Mobilization, Translation of Well Test Program from English into Russian and Logistic coordination with various locations of Schlumberger.

  • 1 Jahr und 7 Monate, Dez. 2003 - Juni 2005

    Wireline Engineer (Open-hole Services)

    Schlumberger

    Wireline Field Engineer (Open-­Hole Services)

Ausbildung von Perhat Gulberdiyev

  • 1 Jahr und 5 Monate, Aug. 2016 - Dez. 2017

    Advanced Management and Finance

    Columbia University

    Financial Management, Global Financial Services, Accounting & Financial Management, Microeconomics, Macroeconomics, Statistical Analysis, US Energy Policy, Global Energy Security and Petroleum Markets and Trading

  • 6 Jahre und 1 Monat, Mai 2009 - Mai 2015

    Drilling Oil and Gas well in Offshore

    Russian State Geological Prospecting University

  • 5 Jahre und 1 Monat, Mai 1999 - Mai 2004

    Software Engineering

    PETRONAS University of Technology

  • 2 Jahre und 1 Monat, Mai 1997 - Mai 1999

    Banking Programmer

    Inter-Center Banking College

Sprachen

  • Englisch

    Fließend

  • Russisch

    Muttersprache

  • Türkisch

    Grundlagen

Interessen

Gym
Meeting People
Politics
Social services
Debate

21 Mio. XING Mitglieder, von A bis Z