
Szakacs Albert
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Szakacs Albert
- Bis heute 6 Jahre und 9 Monate, seit Okt. 2018
Operational Excellence and Industrial Engineering
Hella Ghiroda , Timisoara
- PST reduction for BMS project , up to 5.7 mil. Euro cost savings, period 4 years, source GE-FIT, highest cost savings in the Plant. - Process time studies. - Balancing time work - Detailed analysis and counter measures which deliver best efficiency scenarios for directs, working in production lines ,decreasing the waiting time of directs to bottleneck and documenting and improving cycle times with MTM approach .
- Bis heute 8 Jahre und 5 Monate, seit Feb. 2017
Six Sigma Black Belt & Process Engineer
TT Electronics
Daimler project - in progress
- 1 Jahr und 1 Monat, Okt. 2017 - Okt. 2018
Global Opex specialist .Lean in Administration
Hella Electronics
- 1 Jahr und 3 Monate, Dez. 2015 - Feb. 2017
Process Engineer
TT Electronics
Low costs projects - PLC Logo Comfort programming Six Sigma Black Belt - Starting education in March 2016 Black belt project - closed .
- 9 Monate, Apr. 2015 - Dez. 2015
Process Improvement Specialist , Member of CIP European Team
TT Electronics
Responsible with monitoring and optimization of operational kpi's across 2 divisions. Internally coordinator for six sigma local team for both divisions. Responsible with identifying potential cost saving projects for six sigma and lean manufacturing, main focus on productivity, scrap and breakdowns. Tracking progress for lean and six sigma projects on a weekly basis. Cost savings from my own improvements projects in first half of the year more than 100 k euro.
- 2 Jahre und 5 Monate, Nov. 2012 - März 2015
Process Engineer
TT Electronics, Timisoara City, Romania
Responsible with process relocations and startup of several production lines from Germany to a new factory in Romania. I've lead several workshops having the goal of improving productivity for customers as Audi and VW +10%, Volvo Truck +30% and BMW +20%, SEW +30 % , VW&Audi Gensler +26% outputs using Lean optimization methodology, A3 summary reports and VSM's.
- 8 Monate, Apr. 2012 - Nov. 2012
Process Engineer
Hella Electronics
Interventions on plasma and silicon dispensing machine,injection molding, pcb lasers, plastic&metal welding lasers (uma&oil switch), semi-automatic assembying machines, aiming zero defects, preventing and minimizing breakdowns. Involved in DMAIC project - Reduction of failures at UMA line. Target 10% accomplished. Capability analysis for equipments ussing Minitab16 software.
- 2 Jahre und 4 Monate, Dez. 2009 - März 2012
Production Line Manager
Hella Lighting
Main achievements : - improve efficiency of directs with 20% through continuous optimization and stabilization of processes across the VSM. - OTD from 74% to 96% - implementation of lean manufacturing in harnesses sector by ussing peculiar tools like vsm, standardization, level loading and pull work sequence. - for h.r. - reduction of scrap value in crimping presses with apx. 25% - roll out workcells by successfully implementing S.S. and G.P.Stabilization - wip reduction 27%
Ausbildung von Szakacs Albert
- 1999 - 2004
Enginnering Mechanics
Polytechnic University , Timisoara
Hydraulic and pneumatic machinery
Sprachen
Englisch
-
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.