
Dipl.-Ing. Tiborc Tukács
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Tiborc Tukács
- Current 6 years, since Jun 2020
Powerplant Design
EVN Wärmekraftwerke GmbH
- 2 years, Jun 2018 - May 2020
Mechanical Design Engineer
EMC
- 4 years and 5 months, Oct 2013 - Feb 2018
Senior Mechanical Engineer / Project Engineer / Consultant
AUSTROPLAN – Austrian Engineering GmbH
Project engineering and consultancy with special emphasis on power plant engineering, mechanical and process engineering and consultancy for international cement plant projects. Team member for the design and engineering of cement plant / power plant projects as well as participation on project teams for the elaboration of techno/economic evaluations and studies, tender documentation, etc.
- 1 year and 8 months, Mar 2012 - Oct 2013
Technical Project Manager / Project Engineer
ATEC - GRECO / Austria
Project management and project engineering of building material industrial projects in industrial burner systems. - Project management - Project engineering - Internal standardization - Cost estimation and economical evaluation - Developing the process and basic engineering documentation. - Preparation of tender documentation, - Proposal evaluation and supplier selection - 3D/2D CAD design - Coordinating of suppliers - Controlling the budget and time schedule.
- 1 year and 8 months, Aug 2010 - Mar 2012
Senior Technical Expert - Technical Director
Nabucco Hungary Gas Pipeline Ltd., Budapest/Hungary
Project management of international gas logistic project technical controlling of project development. Investment cost estimation and evaluation. Controlling and reviewing the basic design of gas transport facilities, pipeline. Coordination of project related ESIA studies. Participation of project related land acquisition procedures.
- 2 years and 10 months, Nov 2007 - Aug 2010
Project Engineer – Design and Engineering Center
Lafarge Cement GmbH, Vienna/Austria
Investment projects in cement plant environment up to 20M€ in total. Overall process engineering preparation of Studies with the related Cost Estimation. At the stage of implementation Preparation of Call for Tender, offer evaluation, contractor selection, contracting. Regular site visits to ensure the required technical and safety level. Budget and time schedule control. Start-up, system tests.
- 2 years and 3 months, Sep 2005 - Nov 2007
2D/3D CAD Design Engineer – Mechanical Design, Construction
Hauni Hungaria LTD. Pécs/Hungary
2D/3D Mechanical design of tobacco industry equipment. Process equipment, tobacco conveying equipment. Detailed design and documentation (workshop-drawings, parts lists) of belt conveyors, drying, conditioning and saucing machines according to customers’ needs, support the workshop, keep contact with suppliers and our mother company (Hauni Maschinenbau GmbH) in Hamburg/Germany.
- 1 year and 3 months, Jul 2004 - Sep 2005
Project Engineer
Greenergy Ltd, Budapest (Hungary)
Design and Installations of gas turbine based power plant of 13MWe. As Mechanical Project Engineer I was responsible for coordinating the design and process development works of this combined cycle CHP power plant. Main equipment: - 2 x 6MW Gas Turbine (Centrax KB7) - 1 MW steam turbine (Peter Brotherhood) - Steam and cooling water system - Absorption chillers of 2 MW - 2 MW Absorptionskältemaschinen
- 2 years and 6 months, Feb 2002 - Jul 2004
Technology Engineer / Junior Project Manager
Budapest Power Plant Co. - Budapest (Hungary)
My responsibilities: process investigation and optimization, I have prepared a study how to adopt the EU CHP Power Generation regulations in the power plants of the group. I took part as junior project engineer in technology modification projects like feasibility study of new oil storage tanks, feasibility study of implementing additional power plant gas boilers and connecting to the existing district heating system.
- 3 years and 8 months, Jul 1998 - Feb 2002
Maintenance Engineer
Pécs Power Plant Co. - Pécs (Hungary)
My responsibility was to manage the maintenance works of the boiler and steam system of the power plant. - Analyzing the technical status of the system (measures, analysis). - Designing the yearly maintenance plan. - Making the Call for Tender, choosing the suppliers, preparing contracts. - Preparing the time schedule, coordinating and supervise the maintenance works on site. - Responsibility for keeping the budget, time schedules, contractual parameters.
- 1 year and 11 months, Sep 1996 - Jul 1998
Maintenance Engineer
Paks Nuclear Power Plant Co. - Paks (Hungary)
- Taking part of preparing the maintenance plans for the nuclear reactor system. - Coordinating the site maintenance works of the nuclear reactor system.
Ausbildung von Tiborc Tukács
- 1 year and 11 months, Sep 1997 - Jul 1999
Marketing Management
Janus Pannonius University - Pécs (Hungary)
Postgraduate marketing engineer studies, in the economic faculty.
- 2 years and 11 months, Sep 1993 - Jul 1996
Mechanical Engineering
Budapest University of Technology and Economics
Thermodynamics, Material Engineering, Mechanical Engineering, Mechanical Elements, Power Generation Equipment, Water Treatment Chemistry, Nuclear Power Plants, Conventional Power Plants, Power Plant Calculations
Sprachen
English
C1 (Fließend)
Hungarian
C2 (Verhandlungssicher / Muttersprachlich)
German
A1-A2 (Grundkenntnisse)
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
