Vighnesh Humraskar
Angestellt, Railway Operations - Metro Station, Mumbai Metro One Private Limited
Virar, Indien
Werdegang
Berufserfahrung von Vighnesh Humraskar
Bis heute 7 Jahre und 8 Monate, seit Feb. 2017
Railway Operations - Metro Station
Mumbai Metro One Private Limited
-Managed Mainline train operation centrally in degraded situation from IXL Versova station through VICOS OC 501 system provided by Siemens -Received Appreciation on social media from passenger & organization for providing utmost medical and moral assistance to passengers by providing FIRST AID and by arranging ambulance as per requirement for passenger safety
4 Jahre und 2 Monate, Dez. 2012 - Jan. 2017
Train Driver
Metro One Operation Pvt Ltd
-Successfully completed theoretical, Simulator, practical training and on-board train driving consisting knowledge of Rolling Stock, Diesel locomotive and Catenary Maintenance Vehicle (CMV) by experienced Indian railway and Metro staff -As a crew controller did proper train allocation of train pilots making almost equal trips and similar break time for all on duty train pilots even during degraded operation on mainline ensure proper relieving as per sign OFF time
Ausbildung von Vighnesh Humraskar
2 Jahre und 11 Monate, Juli 2009 - Mai 2012
Electronics and Communication Engineering
University of Mumbai
2 Jahre und 11 Monate, Juli 2009 - Mai 2012
Electronics and Communication Engineering
University of Mumbai