Ing. Vinil Kumar Gangasani

Angestellt, System analyst, Toshiba software India Pvt. Ltd.

Bangalore, Indien

Fähigkeiten und Kenntnisse

HVDC
Substation Automation
Power System Protection
Application Software Programming
Testing
Test
IEC61850
PRP
HSR
PTP
Cyber Security

Werdegang

Berufserfahrung von Vinil Kumar Gangasani

  • Bis heute 5 Jahre und 11 Monate, seit Nov. 2018

    System analyst

    Toshiba software India Pvt. Ltd.

    - QA lead for GR-200 series Toshiba IED's verification and validation. - Implementation of IEC 61850 9-2 & IEC 61869 process bus, Cybersecurity and validation with Protection, Control and Monitoring features of IED. https://www.toshiba-energy.com/en/transmission/product/protection-relay.htm

  • 7 Jahre und 8 Monate, Jan. 2011 - Aug. 2018

    Lead Engineer

    General Electric

    Firmware validation of GE’s Substation Automation Smart Grid products like Protection and Control Relays. Create test plans and test procedures from functional specification and design documents; Report detected defects using the defect tracking system. Execute test procedures, identify and report defects and issues detected during testing.

  • 2 Jahre und 11 Monate, März 2008 - Jan. 2011

    Team Leader

    ABB

    • Designing Control & Protection logics using Hidraw programming tool for HVDC Control & Protection systems (Main computers MC1 & MC2). • Testing the designed code in the factory as a part of Factory System testing (FST). • Involved in complete HVDC project life cycle: Conceptual Design, Application Software Programming, Factory System Testing, Documentation (Test Records & Revision Orders), Commissioning

  • 1 Jahr und 1 Monat, Feb. 2007 - Feb. 2008

    Senior Systems Engineer

    SIEMENS

    • DOMAIN CONSULTANT for Power Transmission & Distribution (PTD) software development team. • Training Software developers on basic concepts of Power Systems. • Application Configuration of Power Control Centre using SIEMENS Spectrum PowerCC Software. • Validation of test cases for Control Centre applications. • Create automated test scripts in Visual Basic using STAS testing tool for HMI testing of PowerCC software.

  • 1 Jahr und 2 Monate, Dez. 2005 - Jan. 2007

    Engineer - Quality & Testing

    ABB

    Executed Real Time Power System Substation Automation System (SAS) Projects using IEC61850 Communication Protocol for power utility companies like PGCIL, NTPC in India. • Involved in Factory Acceptance Test (FAT) of Substation Automation System • Configuration of ABB and SIEMENS Numerical Relays. Engineering of the Binary Inputs, Binary outputs, Analog Inputs, MilliAmpere Inputs for ABB and SIEMENS IED’s

Ausbildung von Vinil Kumar Gangasani

  • 3 Jahre und 10 Monate, Aug. 2000 - Mai 2004

    Electrical & Electronics Engineering

    Osmania university

    Electrical & Electronics Engineering

Sprachen

  • Englisch

    Muttersprache

  • Deutsch

    Gut

Interessen

Philosophy

21 Mio. XING Mitglieder, von A bis Z