
Eugen Eichhorn
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Eugen Eichhorn
- Bis heute 4 Jahre und 9 Monate, seit Nov. 2020
Global Senior Expert Industrial Engineering
BSH Home Appliances Group, Product Devision Cooling
• Development and implementation of standards for stable and safe execution of production processes in the Product Division Cooling • Management of Global Process Descriptions of critical processes in the Product Division Cooling • Leading and support of special projects for Global Production Cooling • Key-Account of Cooling Factory St Petersburg (till 2023) • Development of standards for Digital Color&@BSH – special project of BSH including global Color Database
- 1 Jahr, Nov. 2019 - Okt. 2020
Head of Production
BSH Home Appliances Group, Cooling Factory St Petersburg
• Responsible for production of standalone bottom freezer refrigerators • Deep level of in-house production – metal panels, multicolor paint shop, plastic components, HIPS extrusion, gasket production, thermoforming, foaming etc. • Continuous improvement of major KPIs – Safety, Quality, Cost and Productivity • Planned production volume with 2 lines 220.000appl./year • Leading of 28 white and 280 blue collars
- 2 Jahre, Nov. 2017 - Okt. 2019
Head of Industrial Engineering Department
BSH Home Appliances Group, Cooling Factory St Petersburg
• Planned und organized factory production • Specified, purchased, commissioned and ramped up production equipment • Created 2 factory masterplans with planning horizon of 7 years • Defined I4.0 Factory Strategy and largely established • Standardized production equipment and processes • Localized components and equipment • Continuously improved productivity and costs (yearly ratio value ca. 1Mio €) • Leading 3 Teams with 13 Engineers in total
- 2 Jahre und 1 Monat, Okt. 2015 - Okt. 2017
i4.0 Business Unit Coordinator
Bosch Gruppe, Shassis Control Devision, Abstatt
• I4.0 Strategy for Actuators Business Unit developed and largely established • Planned budget and calculated ROI for I4.0 Projects • I4.0 solutions in Actuators factories (10 plants worldwide) standardized and implemented • Standard for MES System und digital shop floor management defined and implemented • Connectivity of older equipment to MES system defined and established
- 1 Jahr und 1 Monat, Sep. 2014 - Sep. 2015
Head of Technical Functions Department, Plant Manager Substitute
Bosch Gruppe, Shassis Control Devision, Plant Samara
• SOP (06.2015) of Anti Block System (ABS) realized on time • State, internal and customer release of the Plant obtained before SOP • Leadership Range: facility management, security, health, safety, environment, IT
- 2 Jahre und 8 Monate, Feb. 2013 - Sep. 2015
Project Leader of New Plant Construction
Bosch Gruppe, Shassis Control Devision, Plant Samara
• Construction of the plant successfully realized within cost and time frame • Construction of external infrastructure by local authorities introduced on time • Plant structure for 4 Divisions (Chassis, Diesel, Starters, Drives) established • Specification book developed for plant with 22.000 m2 building space • 10 Employees found, employed and qualified
- 3 Jahre, Feb. 2010 - Jan. 2013
Head of Power Tools Development Department
Robert Bosch Power Tools GmbH, Plant Engels
• development/production support of Power Tools (Angle Grinders, Impact Drills, Drill Hammers, Jig Saws) • Lifetime test bench with infrastructure defined and released • Measurement lab and measurement tools installed and qualified operating personnel • Build up development department from 12 to 23 indirect employees (international team) • Practical tests of power tools for international Customers upgraded and released
- 3 Jahre und 5 Monate, Feb. 2006 - Juni 2009
Project Leader Assembly and Test Equipment
Bosch Gruppe, Special Mashinery, PLant Charleston
• Realization of Projects: universal Brakes Assembly Line (2,2Mio $), Corvette/Camaro Brakes Assembly Line (1,9Mio$), Ceramic Coating (Plasma Technology) of Oxygen Sensors (2,5Mio$) • Led cross functional project team with 20 Employees • Supported mechanical design team and created offers for equipment
- 6 Jahre und 4 Monate, Okt. 1999 - Jan. 2006
Lead Mechanical Designer for Assembly and Test Equipment
Bosch Gruppe, Special Machinery, Stuttgart
• First „LEAN“ Assembly Line for Common Rail Injectors designed and built • Defined assembly and test processes • Created specification books • Professional responsibility for workstations mechanical designers, substitute of project leader
Sprachen
Deutsch
Muttersprache
Englisch
Fließend
Russisch
Muttersprache
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.