Eugen Eichhorn

Angestellt, Global Senior Expert Industrial Engineering, BSH Home Appliances Group, Product Devision Cooling
Giengen an der Brenz, Deutschland

Fähigkeiten und Kenntnisse

Management
Lean Production
Industrial Engineering
Production management
Project Management
Manufacturing engineering
Head of Department
Manufacturing Control
Mechanical Engineering
Product Development

Werdegang

Berufserfahrung von Eugen Eichhorn

  • Bis heute 4 Jahre und 9 Monate, seit Nov. 2020

    Global Senior Expert Industrial Engineering

    BSH Home Appliances Group, Product Devision Cooling

    • Development and implementation of standards for stable and safe execution of production processes in the Product Division Cooling • Management of Global Process Descriptions of critical processes in the Product Division Cooling • Leading and support of special projects for Global Production Cooling • Key-Account of Cooling Factory St Petersburg (till 2023) • Development of standards for Digital Color&@BSH – special project of BSH including global Color Database

  • 1 Jahr, Nov. 2019 - Okt. 2020

    Head of Production

    BSH Home Appliances Group, Cooling Factory St Petersburg

    • Responsible for production of standalone bottom freezer refrigerators • Deep level of in-house production – metal panels, multicolor paint shop, plastic components, HIPS extrusion, gasket production, thermoforming, foaming etc. • Continuous improvement of major KPIs – Safety, Quality, Cost and Productivity • Planned production volume with 2 lines 220.000appl./year • Leading of 28 white and 280 blue collars

  • 2 Jahre, Nov. 2017 - Okt. 2019

    Head of Industrial Engineering Department

    BSH Home Appliances Group, Cooling Factory St Petersburg

    • Planned und organized factory production • Specified, purchased, commissioned and ramped up production equipment • Created 2 factory masterplans with planning horizon of 7 years • Defined I4.0 Factory Strategy and largely established • Standardized production equipment and processes • Localized components and equipment • Continuously improved productivity and costs (yearly ratio value ca. 1Mio €) • Leading 3 Teams with 13 Engineers in total

  • 2 Jahre und 1 Monat, Okt. 2015 - Okt. 2017

    i4.0 Business Unit Coordinator

    Bosch Gruppe, Shassis Control Devision, Abstatt

    • I4.0 Strategy for Actuators Business Unit developed and largely established • Planned budget and calculated ROI for I4.0 Projects • I4.0 solutions in Actuators factories (10 plants worldwide) standardized and implemented • Standard for MES System und digital shop floor management defined and implemented • Connectivity of older equipment to MES system defined and established

  • 1 Jahr und 1 Monat, Sep. 2014 - Sep. 2015

    Head of Technical Functions Department, Plant Manager Substitute

    Bosch Gruppe, Shassis Control Devision, Plant Samara

    • SOP (06.2015) of Anti Block System (ABS) realized on time • State, internal and customer release of the Plant obtained before SOP • Leadership Range: facility management, security, health, safety, environment, IT

  • 2 Jahre und 8 Monate, Feb. 2013 - Sep. 2015

    Project Leader of New Plant Construction

    Bosch Gruppe, Shassis Control Devision, Plant Samara

    • Construction of the plant successfully realized within cost and time frame • Construction of external infrastructure by local authorities introduced on time • Plant structure for 4 Divisions (Chassis, Diesel, Starters, Drives) established • Specification book developed for plant with 22.000 m2 building space • 10 Employees found, employed and qualified

  • 3 Jahre, Feb. 2010 - Jan. 2013

    Head of Power Tools Development Department

    Robert Bosch Power Tools GmbH, Plant Engels

    • development/production support of Power Tools (Angle Grinders, Impact Drills, Drill Hammers, Jig Saws) • Lifetime test bench with infrastructure defined and released • Measurement lab and measurement tools installed and qualified operating personnel • Build up development department from 12 to 23 indirect employees (international team) • Practical tests of power tools for international Customers upgraded and released

  • 3 Jahre und 5 Monate, Feb. 2006 - Juni 2009

    Project Leader Assembly and Test Equipment

    Bosch Gruppe, Special Mashinery, PLant Charleston

    • Realization of Projects: universal Brakes Assembly Line (2,2Mio $), Corvette/Camaro Brakes Assembly Line (1,9Mio$), Ceramic Coating (Plasma Technology) of Oxygen Sensors (2,5Mio$) • Led cross functional project team with 20 Employees • Supported mechanical design team and created offers for equipment

  • 6 Jahre und 4 Monate, Okt. 1999 - Jan. 2006

    Lead Mechanical Designer for Assembly and Test Equipment

    Bosch Gruppe, Special Machinery, Stuttgart

    • First „LEAN“ Assembly Line for Common Rail Injectors designed and built • Defined assembly and test processes • Created specification books • Professional responsibility for workstations mechanical designers, substitute of project leader

Sprachen

  • Deutsch

    Muttersprache

  • Englisch

    Fließend

  • Russisch

    Muttersprache

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z