Professional experience for Evgeniy Legan
- 11 months, Jul 2022 - May 2023
Engineering Maintenance Manager
Innolume GmbH
- maintenance department management in a semiconductor factory (50+ equipment pieces) - supervision of processes to maintain and optimise the production line - continuous evaluation of equipment and processes - installation of new machines in the semiconductors area - budget planning - occupational safety assurance: 2 potential accidents prevented
- 5 years and 3 months, Apr 2017 - Jun 2022
Chief Engineer/Head of Innovation
BUTIS Ltd.
- supervision of the RF-filters manufacturing company relocation project from scratch to serial production - ISO5 cleanroom engineering project completion - IT and Maintenance departments management - manufacturing equipment acceptance - custom Flip-Chip technology implementation - "As-is" and "To-be" processes mapping for the executive management - ERP-system integration guidance
- 5 years and 3 months, Feb 2012 - Apr 2017
Deputy Chief Engineering
Eltech LLC
- supervision of the local and outside teams of Field Service Engineers. 50+ customers supported - installation, commissioning, and after-sales services for semiconductor industry customers with successful outcomes - technology transfer oversight
- 2 years and 8 months, Oct 2012 - May 2015
Lead Engineering Technologist
Eltech SPB LLC
- semiconductor manufacturing equipment installation, commissioning and maintenance (over 40 pieces of equipment installed and supported personally) - wafer lapping/CMP, lithography, PVD, wafer/chip/wire bonding, thin film characterisation processes demonstration - customer training
- 9 months, Feb 2012 - Oct 2012
Engineering Technologist
Eltech SPB LLC
- pre-commissioning inspections and tests - startup and testing of systems and equipment - fine-tuning and optimization services - commissioning documentation and reports - training to operational staff
- 2 years and 11 months, Apr 2009 - Feb 2012
Design Engineer
Nevskoe Design Bureau JSC
- electrical schematics and equipment placement drawings design, including cable lists and full specifications - on-site inspection of the construction works (over 6 months)
- 2 years and 1 month, Apr 2007 - Apr 2009
Head of maintenance department - Medical equipment
KIROV Medical Academy
- oversight of the medical equipment maintenance and calibration for the 38 clinics - supervision of the medical Oxigen systems inspection and maintenance
- 8 months, Sep 2006 - Apr 2007
CNC Installation Engineer
Rubicon Innovation JSC
- design of the CNC manual controls module and the electrical drawings development - custom CNC system upgrades, installations and maintenance
Educational background for Evgeniy Legan
- 1 year and 8 months, Sep 2005 - Apr 2007
Electric Drive and Automation of Industrial and Technological Equipment
Moscow Power Engineering Institute
- 4 years and 1 month, Sep 2001 - Sep 2005
Power engineering
Moscow Power Engineering Institute
Languages
English
C1 (Fluent)
German
A1-A2 (Basic)
Russian
C2 (Expert / native speaker)
XING members with similar profiles
XING – The jobs network
Over 1 million jobs
Find just the right job for you on XING.
Job offers just for you
Get found by employers and over 20,000 recruiters.
21 million members
Connect with new people and gather inspiration to boost your working life.
Free membership
Basic membership is free, but the opportunities are priceless.