Francisco De Paula Palma Alba
Angestellt, Project Manager, Deutsche Bahn AG
Munich, Deutschland
Werdegang
Berufserfahrung von Francisco De Paula Palma Alba
Bis heute 7 Jahre und 5 Monate, seit Dez. 2016
Project Manager
Deutsche Bahn AG
Management and implementation in the field of sewer rehabilitation projects around the planning,construction and operation of water sanitation systems as well as optimization of the facilities Take over responsibility within the Regional Office as well as special tasks Authorized representative of the owners of real estate within the DB AG Technical advice on sewer infrastructure and drainage systems Preparation of bills of quantities,tendering and awarding processes in connection with purchasing
3 Jahre und 4 Monate, Aug. 2013 - Nov. 2016
Project Engineer
Kuchler Service Gruppe. Germany.
- Sewage projects planning. - Inspections and measurements of the worksites. - Support for the quality, planning and timely completion of water related projects and construction accounting in the field of sewer rehabilitation with robotic technology, wastewater engineering, piping, building rehabilitation, civil engineering and building drainage. - Control of reports sewerage related works and project for the quality Association "Güteschutz Kanalbau".
7 Monate, Sep. 2012 - März 2013
R&D&I Engineer (Leonardo da Vinci EU programme)
Crystal Water Natural Perfect Solution GmbH. Germany.
- Work in project planning, development, pilot projects in Water/Wastewater treatment and carry out all concerning UAE/GCC/MENA. - Participation in activities together with German Water Partnership to offer latest technologies on international level as representation of Germany.
3 Monate, Juli 2012 - Sep. 2012
Research Engineer
University of Córdoba, Department of Chemical Engineering. Spain.
- Waste water Treatment Projects Planning. - Cooperation in the field of Research of wastewater treatment projects. - Analysis and study of wastewater and surface, under the current contract between said Research Group "Chemical Engineering" at the University of Córdoba and the company ENRESA entitled "Diagnostic Performance of Water Treatment Plant AC EL CABRIL. Suggestions for improvement"
7 Monate, Feb. 2012 - Aug. 2012
Project Manager
Freelance (SIOLSA Ingeniería). Spain
- Irrigation system planning. - Project manager and designer for the automation of the irrigation network by wireless communications concerning to the project "Installation of an economic remote and telemeter system in the irrigation Community El Villar".Surface 2700 ha. - Subscribe act of redefinition and certificate of completion. Writing certificates and permits. - Quality control and material reception. Geometric control of the work. Control costs and deadlines.
4 Monate, Nov. 2011 - Feb. 2012
Chief Engineer
Cavenco. Qatar
- Being the head in the direction and planning of the works. - Technical advice regarding the engineering and construction. - Search and subsequent recruitment qualified personnel as well as responsible of them. - Intermediate and representative of the company to new investment projects in the Arab countries.
10 Monate, Sep. 2010 - Juni 2011
International Sales Engineer
Saleplas & GEOthermic System. SPAIN
- Within the sector of water and energy in two joint companies, preparing of commercial offers and sales tracking. "Supply Chain Management" (transports management, freight, times, documents, etc.). - Use of tools "Lean manufacturing" to improve service and reduce costs in the business. - Preparing of tenders for international projects. - Definition of pricing policies, costs and margins. - Open new markets, feasibility study, search agents, etc. - Implementation of international exhibitions.
1 Jahr, März 2009 - Feb. 2010
Technical Manager
Salva García Irrigation Community. Spain.
- Transformation of facilities to improve energy efficiency in irrigation. - Management drainage and roads works. - Development of new water infrastructure. - Topography. - Professional relationships with public officials.
Ausbildung von Francisco De Paula Palma Alba
4 Monate, Mai 2012 - Aug. 2012
H2TC. SPAIN
- Analysis of the profitability of an investment project. - Solar radiation. - Wind Power. - Passive Solar. - Solar thermal. - Electrification photovoltaic and wind - Minipower - Biomass waste
1 Jahr und 1 Monat, Juni 2011 - Juni 2012
MSc
Colegio Oficial de Ingenieros Técnicos Forestales
General concepts on water and soil pollution and management • Water quality • Groundwater contamination studies • Planning groundwater consumption • Water • Wastewater • Soft technologies debugging: rapid infiltration and green filters • Water desalination • Environmental education • Applicable regu
6 Monate, Aug. 2009 - Jan. 2010
Instituto Europeo de Estudios Empresariales
International Trade Contracts • Expert in administration and management of commercial departments. • International trade.
7 Monate, Juli 2009 - Jan. 2010
MPE
Ergonomy, Psychosociology, Industrial Hygiene and Safety at Work.
7 Jahre und 10 Monate, Okt. 2000 - Juli 2008
ENGINEER
ESCUELA TÉCNICA SUPERIOR DE INGENIEROS AGRÓNOMOS Y MONTES DE CÓRDOBA, SPAIN
Final Project: Environmental Impact Study of power plant project to produce electricity from waste olive oil in Montilla (Córdoba), SPAIN with a score of 100% Distinction.
Sprachen
Spanisch
Muttersprache
Englisch
Gut
Deutsch
Fließend