Ing. Juan Pablo Dodero Bendaña
Angestellt, Rotating Equipment Team Leader, Grupo Navec
Salou, Spanien
Werdegang
Berufserfahrung von Juan Pablo Dodero Bendaña
Bis heute 6 Jahre und 10 Monate, seit Dez. 2017
Rotating Equipment Team Leader
Grupo Navec
My main responsibilities are the EHS, the efficiency and effectiveness of the team, the continuous improvement and detect the need for human resources, training and materials with the purpose of achieving the department's objectives, create, update and evaluate KPI to achieve the compliance of the preventive/predictive maintenance program, provide technical support to vibration and lubrication technicians, equipment start-up, monitoring of main equipment, intervention reports control, prepare procedures.
2 Jahre und 11 Monate, Feb. 2015 - Dez. 2017
Predictive Maintenance Engineer
Grupo Navec
Implement and perform preventive and predictive maintenance for 12 facilities at DOW Iberica (Tarragona) by analyzing oil samples, vibrations and thermographic images with the purpose of anticipate failures, reduce maintenance cost, improve equipment reliability and be a focal point to the Department`s Technicians if necessary.
2 Jahre und 7 Monate, Aug. 2012 - Feb. 2015
Project Manager and Design Engineer
D3e Servicios de Ingeniería S.R.L
Perform basic and detailed engineering for electrical, mechanical and automation projects, establishment of safety standards, site management, preventive and predictive maintenance consulting and establishment of budgets.
The Reliability Engineer works to facilitate development of the business/facility maintenance strategy, and solves reliability/availability losses through application of reliability technology and tools to enable the plant to meet its business plan and strategy. This result is achieved by focusing on those opportunities that over a long-term period or historically has impacted the plant’s measured asset capability and the opportunities identified as "highrisk" in risk assessments, reliability models, etc.
The Maintenance Representative works to ensure the project team to delivers a plant to the business that will meet the business plan in the areas of reliability, availability and maintainability, by applying minimum cost of ownership principles from the project identification through to startup. The purpose of this role is to represent the maintenance function and local maintenance organization on project teams that are using global project methodology.
My main activities were Strategies Equipment, Performance Indicators of Maintenance, Failure Analysis, Root Cause Analysis, Tracking failures via E&Atool, Project Monitoring Improvement of Reliability, Monitoring consumption of spare parts, Optimization, Participation in Planning and Scheduling of turn arounds, Organization and Implementation of meetings.
Ausbildung von Juan Pablo Dodero Bendaña
1 Jahr und 8 Monate, Feb. 2017 - Sep. 2018
Master in Industrial Maintenance
Universidad Politecnica de Madrid, ETSI Minas, Spain / MasterD
Industrial Maintenance
9 Jahre und 1 Monat, Feb. 2002 - Feb. 2011
Industrial Engineer
Universidad Nacional del Sur
Sprachen
Englisch
Fließend
Spanisch
Muttersprache