Kerem Ertem
Bis 2022, Supplier Development Manager, Eczacıbaşı Yapı Gereçleri
Eskişehir, Türkei
Über mich
Goal-oriented leader in production engineering, product design, process quality areas in automotive, kitchen appliances and building materials manufacturing industries. Leaded plant launch, product development, cost reduction, supplier development, quality improvement and process design projects. Experienced in BIW robotic & manual welding, plastic injection & moulding, sheet metal forming, iron casting, machining, electroplating & paint processes.
Werdegang
Berufserfahrung von Kerem Ertem
10 Monate, Okt. 2022 - Juli 2023
Quality Manager
Bulut Galvano Metal
6 Jahre und 3 Monate, Aug. 2016 - Okt. 2022
Supplier Development Manager
Eczacıbaşı Yapı Gereçleri
- Developed quality/cost improvement projects for critical commodities and achieved 250 k€ yearly cost savings by process improvements - Conducted on site supplier assessments, suggested ways to develop supplier capabilities, achieved 10% improvement in overall targets - Coordinated key NPI projects with suppliers and collaborated with product development engineers for on-time PPAP submission approval with quality targets - Managed localization projects for critical commodities in collaboration
3 Jahre und 4 Monate, Mai 2013 - Aug. 2016
Project Manager
Componenta
- Evaluated RFQs for 300+ iron casting parts, prepared technical feasibilities, production cost analysis and design improvement proposals - Conducted NPI projects with an emphasis on equipment facility fit analysis, time planning, process & equipment design to support PPAP requirements and compliance with global standards - Successfully managed 30+ NPI projects; motor blocks, cylinder heads, bogie anchorage brackets, planet carriers, axle housings, gearbox housings
2 Jahre und 6 Monate, Dez. 2010 - Mai 2013
Product Development Engineer
Ford Otosan
- Prepared Bill of Materials (BOM) for 1800+ body parts in MCV (Ford Courier) project, estimated part and investment costs, analyzed technical issues of key commodity parts, and successfully achieved program approval (PA) on time. - Supervised design & release engineers in body exterior teams and ensured that all technical specifications were provided - Collaborated with product development, quality, finance, manufacturing, procurement departments and monitored progress
1 Jahr und 1 Monat, Mai 2009 - Mai 2010
R&D Manager
İNOKSAN A.Ş.
- Developed and implemented new product plans for professional kitchen and food service appliances - Reviewed the sales teams’ feedbacks and suggested new products - Directed the leading edge automatic combi-gas (Inosmart) oven design for efficient gas consumption, and modular dish washing machine (conveyor type) design for efficient water and electric consumption - Coordinated global OEM projects; new food service lines (for Electrolux and Tesco), and achieved successful completion of sample production
1 Jahr und 4 Monate, Feb. 2008 - Mai 2009
Product Development Engineer
Groupe Renault
- Collaborated with cross functional groups to update design in order to understand deliverables and achieve customer and engineering requirements - Achieved 300 k€ yearly cost savings by interior trim parts’ design improvements for vehicle programs (Renault Symbol 2 and Megane 3) - Developed dFMEA plans and conducted testing according to APQP and PSW - Supported pre-launch and launch builds by providing onsite engineering - Identified and solved multiple design issues regarding manufacturing quality
9 Monate, Juni 2007 - Feb. 2008
Prototype Specialist
TOFAŞ/FIAT
- Assisted and was a key part in prototype body manufacturing and assembly, with an emphasis on cost, timing, process design, requirements and standards. - Searched, analyzed and developed feasibility reports for new rapid prototyping technologies (FDM, SLS, SLA) and implemented in prototype shop.
2 Jahre und 7 Monate, Nov. 2004 - Mai 2007
Production Engineer
Toyota Motor Manufacturing Turkey
- Analyzed and reconfigured 64000-square-meter plant layout, improved efficiency, reduced shop tact-time - Provided engineering excellence for new product (Auris) introduction - Managed major (50 million EUR budget) project; launch of new Global Body Line, with an early finish by 2 months in schedule - Engineered plant utility requirements, designed process and utility lay-outs - Specified and coordinated design & build of equipment (fixtures, conveyors, lifts & robots)
Sprachen
Türkisch
Muttersprache
Englisch
Fließend
Italienisch
Grundlagen
Deutsch
Grundlagen
Französisch
Grundlagen