
Mathias Seibitz
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Mathias Seibitz
- Bis heute 5 Jahre, seit Juli 2020
Projektleiter & Team Lead Tunnel ElbX (@SuedLink)
TenneT TSO GmbH
- 1 Jahr, Juli 2019 - Juni 2020
Renewables Lead (Kuala Lumpur, Malaysia)
Jacobs Engineering Group Malaysia
Leading the business development and selected project delivery for renewable energy projects (hydropower, solar, wind, geothermal) across Asia, with focus on Malaysia, Indonesia, Philippines, Singapore, Thailand. Strategic plans and delivery efforts to grow and transform the business towards zero-carbon power generation. Coordination and collaboration with diverse expert functions in Jacobs' offices across the globe.
- 7 Monate, Dez. 2018 - Juni 2019
Engineering Manager / Project Manager (Istanbul, Turkey)
Borusan EnBW Enerji
Borusan EnBW Enerji invests in renewable energy projects, including wind, solar and hydropower and is currently operating an installed capacity of 500 MW. Engineering Manager for a team with diverse engineering functions including civil, geotechnical, geophysical, survey, transportation and electrical engineering. Project Manager for key renewable energy projects.
- 2 Jahre und 10 Monate, Feb. 2016 - Nov. 2018
Civil & Geo Engineering Manager / Project Manager (Istanbul, Turkey)
Borusan EnBW Enerji
Assignment as Line Manager leading the Civil & Geo Engineering team in a matrix organisation. Provided internal engineering services to diverse renewable energy projects both in the investment and operation phases. Concurrently, Project Manager for the exploration and drilling phases of two 4,000m deep geothermal wells.
- 5 Jahre und 1 Monat, Jan. 2011 - Jan. 2016
Hydropower Engineering Manager / Project Manager (Istanbul, Turkey)
Borusan EnBW Enerji
Engineering & Project Manager for the development of two large hydropower projects (55 MW and 170 MW) from pre-feasibility stage to tender design and tender for construction. Contracted and coordinated layout studies, photogrammetric mapping, geotechnical investigations, feasibility and tender design. Engagement of local Turkish and international consultants and utilisation of internal engineering resources. Initiated tenders and negotiated the tunnel, civil construction, E&M, hydromechanical and ETL lots.
- 3 Monate, Okt. 2010 - Dez. 2010EnBW Energie Baden-Württemberg AG
Senior Engineer (Stuttgart, Germany)
Technical consultancy and due diligence services for large hydropower projects for the associated company Borusan EnBW Enerji (Turkey).
- 1 Jahr und 9 Monate, Jan. 2009 - Sep. 2010
Construction Manager (Essen, Germany)
HOCHTIEF Construction AG
Engaged in construction planning, scheduling, work preparation and cost estimating for large-scale tunnelling, metro and infrastructure tenders. Conducted performance analyses of executed TBM tunnelling projects, including advance rates, cutter wear and forensic damage and loss reports. Provided after-sales services and performance assessments for completed tunnel projects.
- 2 Jahre, Jan. 2007 - Dez. 2008
Construction Manager - Intakes (Fort Augustus, Scotland, UK)
HOCHTIEF Construction AG
The construction of the 100 MW Glendoe Hydropower Project was based on a turnkey EPC type contract incl. TBM drive and E&M power generating equipment. Responsible for site selection, toposurvey, geotechnical investigations, design, construction, testing, commissioning, landscaping and handing over of 17 water intake structures. Coordination of linear construction activities along a sophisticated network of water conveyance pipelines from intakes to the reservoir.
- 2 Jahre und 7 Monate, Juni 2004 - Dez. 2006
Project Manager Assistant (Bad Vilbel, Germany)
Lahmeyer International GmbH
Engaged in the Rogun Hydropower Project (3.600 MW, Feasibility Study, Tajikistan) and in the Merowe Dam Project (1.250 MW + 30 MW, Feasibility Study, Sudan). Prepared Feasibility Studies and carried out energy & sedimentation calculations, hydraulic engineering, design, construction planning and economic assessment of large scale hydropower projects. Coordinating project team members in a multi-office environment.
- 3 Jahre und 5 Monate, Jan. 2001 - Mai 2004
Site Engineer (Katse, Lesotho)
HOCHTIEF Construction AG
The Lesotho Highlands Water Project (LHWP Phase 1B) is a large-scale water supply project located in the highlands of Lesotho. I was responsible for TBM tunnel grouting works, completion of surface civil works, installation and commissioning of E&M equipment and tunnel dewatering pump systems. Grouting claim management and successful negotiations. During the project closure phase I took the responsibility for rehabilitation, landscaping and handing over of the Mohale Tunnel Outlet site.
Ausbildung von Mathias Seibitz
- 1 Jahr und 5 Monate, Aug. 2016 - Dez. 2017
Excecutive Master of Business Administration
Koç University Graduate School of Business
- 5 Jahre und 3 Monate, Okt. 1995 - Dez. 2000
Civil Engineering / Bauingenieurwesen
Technische Universität Dresden
Hydraulic Engineering & Hydropower / Wasserbau & Wasserkraft. Specialization in coastal engineering, harbour engineering, waterways, ship locks, dams and hydropower.
Sprachen
Deutsch
Muttersprache
Englisch
Fließend
Türkisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.