
Nuri GÖKSUAKAR
Werdegang
Berufserfahrung von Nuri GÖKSUAKAR
- Bis heute 4 Jahre und 6 Monate, seit Apr. 2022
Technical Manager
ASELEKTROMEKANİK ENERGY
He worked with foreign and domestic companies on electrification issues related to rail systems ,electromechanical works, energy and construction works, preparing tender documentation, tracking and managing installation and construction phases, testing and commissioning, and managing all processes up to temporary acceptance.In addition, he also works as a consultant and manager on monitoring the preparation of projects within the scope of tenders,work schedule, material selection, budget management, subco
- 1 Jahr und 1 Monat, Apr. 2025 - Apr. 2026
ELECTRICAL WORKS CHIEF
VIVIN CONSTRUCTION
Bursa Liv Hastanesi'nde elektrik işleri şefi olarak çalıştı. Hastanenin kapasitesi 157 hasta odası ve 161 poliklinik 11 ameliyathane ve diger ilgili birimlerden oluşmaktadır. He worked as the head of electrical works at Bursa Liv Hospital. The hospital has a capacity of 157 patient rooms, 161 outpatient clinics, 11 operating rooms, and other related units.
- 1 Jahr und 1 Monat, Apr. 2021 - Apr. 2022
ELEKTROMEKANİK İŞLER MÜDÜRÜ
KOLİN-UZKA JV
Kayseri 4. Aşama Hafif Raylı Ulaşım Projesi Tramway Hattı Yapım İşleri kapsamında çalıştı. Proje 11 İstasyonlu olup Kayseri LRT hattının uzunluğu 6,7 km’ dir. İki hatlı hafif şehir içi raylı sistem Kapsamında; Kataner Sistemi-Sinyalizasyon Sistemi-Haberleşme Ve Kontrol Sistemi ve Tramvay Aracı İmalatı (5 Adet) malzeme temini sözleşme ve taşeron yönetimi Müşavir ve İdare onayları süreçlerini yönetti. (2020 EM BF /EM COST 23.000.000 USD)
- 1 Jahr und 4 Monate, Juli 2019 - Okt. 2020
Project Manager
ATEF
Azerbaycan Demir Yolları Projesi Olan 500 KM lik Bakü-BüyükKesik Demiryolu Rehabilitasyonu Projesi kapsamında Enerji ( 3 KV DC VE 110/27,5 KV AC),Kataner Demontaj –Montaj İşleri Ve Kataner Besleme Noktaları, İstasyon ve Trafo Merkezleri Yenileme Ve Devreye Alma İşleri ile ilgili Çalıştı. Sistem hem EN Teknik Standartlarını hem de RUS GOST TEKNİK STANDARTLARINI içermektedir. (450.000.000 USD
- 1 Jahr, Aug. 2018 - Juli 2019
SENIOR RAILWAY ELECTRIFICATİON SPECIALIST CHIEF ENGINEER
PROYAPI A.S
Worked as a Senior Railway Electrification Specialist in Baku within the scope of the Bileceri, Yalama Railway Substations Project of the North-South Corridor, which is the Azerbaijan Railways Project. Within the scope of the project, 5 pieces 110/27.5/10 kV Transformer Stations belong to these Substations, and a total of 50 km 110kV ETL is included. In the substations, there are 2 pieces of 110/27.5/10kV Power Transfor., internal demand transformers, booster Transformer that feeds the emergency
- 2 Jahre und 8 Monate, Juli 2015 - Feb. 2018
Project Manager
KYT ELECTRIC CO.
Carried out works of Adana New City Stadium Project, Lighting Automation - Soundtrack – Stadium Lighting Systems –Live Broadcasting –Fiber Infrastructure-Energy Automation -Medium Voltage (31.5kV) and Low 220/380V) Voltage systems installation as-built progress payment-comparison and new unit price studies
- 2 Jahre und 6 Monate, Sep. 2012 - Feb. 2015
PROJECT MANAGER
ULTRA TEKNOLOJİ A.Ş
Within the scope of Boğazköprü-Yenice-Mersin- Toprakkale Electrification Project, 27.5 kV Transformator Substations , Overhead Line System - Testing and Commissioning Works management was included. Left the project voluntarily. Tender price 15,000,000 USD /2012
- 1 Jahr, Jan. 2014 - Dez. 2014
CONTROL SPECIALIST/CONSULTANT
TYPSA-SAFEGE-ESER CONSORTIUM
The Irmak-Karabük-Zonguldak (IKZ) Railway Line Rehabilitation and Signaling Project is one of the largest railway projects jointly financed by Türkiye and the European Union. The project encompasses the complete renovation of the 415-kilometer line between Ankara (Irmak) and Zonguldak, and the improvement of its signaling infrastructure. The project is entirely under FIDIC Conditions of Contract, and all operations have been completed within the framework of FIDIC.
- 5 Jahre und 9 Monate, Nov. 2006 - Juli 2012
PROJE MÜDÜRÜ
ABB ELEKTRİK SAN A.Ş
.Adana Raylı Sistem Projesi kapsamında bulunan Elektromekanik montaj kapsamında bulunan Havai Hat sistemi ,Güç Sistemleri (30 kV,400V ,750 V DC) ,sinyalizasyon ve haberleşme sistemleri montajı ,testleri hakedişleri kesin kabul ve kesin hesap,claim ve ödemelerin ile ilgili projeye ait yönetim ve saha işlerinin yürütülmesi konularında projeyi tamamladım Ayrıca şu anda Rüzgar Santrali Projesi kapsamında 3 fiderli yeni 154 kV şalt tesisi ve HES e baglı mevcut 154 kV Şalt tesisine fider eklenmesi işl
Ausbildung von Nuri GÖKSUAKAR
- 6 Jahre und 1 Monat, Sep. 1991 - Sep. 1997
elektrik-elektronik müh.
yakın dogu üniversitesi
high voltage ,rail system,catanery system,power system
Sprachen
Türkisch
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
