
Dipl.-Ing. Roelof Ritsema
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Roelof Ritsema
- Bis heute 3 Jahre und 5 Monate, Okt. 2022 - März 2026
Senior Projectmanager Facilities & Engineering
Novidon | Sustainable starch solutions
• End-to-end responsibility for multiple CAPEX and OPEX projects in a food-grade, GMP-aligned production environment • Delivered a 44 m³/h process water treatment plant, including civil works, steel structures, platforms, utilities, and commissioning • Led development and commissioning of a new extrusion-based production line for innovative starch derivatives • Managed tendering, procurement, FAT/SAT, validation activities, and final handover to operations • Active participant in technical board meetings
- Bis heute 3 Jahre und 5 Monate, Okt. 2022 - März 2026
Principal Capital Project Leader, Engineering, Facilities & GMP
A diversity of companies as listed in resume
Principal project management professional with over 35 years of experience leading complex CAPEX projects from start to handover in food, beverage, pharmaceutical, mechanical engineering sectors • Ultimately responsible for multi-million dollar projects, including scope, planning, budget, risk management • Expertise in multidisciplinary teams, stakeholder alignment, validation support (cGMP/FDA), EPC project execution • Strong in budget forecasting, financial reporting, contract management, documentation
- 2 Jahre und 10 Monate, Apr. 2022 - Jan. 2025
Consultant Senior Projectmanager
Progressive recruitment and Huxley both as part of S|Three
Consultant as a Senior Projectmanager
- 7 Monate, Apr. 2022 - Okt. 2022
Principal Project Manager Capex and Opex facilities & engineering
Dechra Veterinary Products Netherlands
• Responsible for technical changes, expansions, and new installations in FDA-regulated injectable production. • Coordinated URS, change control, impact assessments, validation, and calibration strategies. • Delivered two new vial packaging lines including labeling and sterilization. • Expanded mixing units and utilities; executed site redesign including security and infrastructure.
- 1 Jahr und 9 Monate, Juli 2020 - März 2022
Project manager Engine dev at Paccar-DAF
Daf-Paccar
• Led complex powertrain development programs compliant with Euro 6, CARB, and US EPA regulations. • Managed cross-functional teams (HW&D, EE, Validation, Purchasing, Finance) across global matrix organizations. • Accountable for planning, budget, technical reviews, and executive reporting.
- 1 Jahr und 9 Monate, Juli 2020 - März 2022
Consultant Senior Projectmanager
Yacht recruitment Amsterdam
Consultant as Senior Pojectmanager
- 6 Jahre und 7 Monate, Jan. 2014 - Juli 2020
Project Manager (PMP) New Proces and Product improvement (NPPI) in Wilrijk (B)
Atlas Copco Airtec division
• Program lead for €2–28M EPC-M projects involving global production facilities (EU, US, China, India). • Delivered new compressor products, production lines, and factory expansions. • Directed international engineering teams and global suppliers. • Managing tender projects from engineering to commissioning for complete systems
- 1 Jahr und 2 Monate, Okt. 2012 - Nov. 2013
Senior Projectmanager Capex and Opex for German speaking countries
AB-Inbev sa
Capex Project manager for Setting up, monitoring and executing investment projects for the installations of Anheuser Busch Inbev in the area West Europe (Benelux, France and Germany). These tasks will be performed in the capacity of Consultant of the company Altran. Capex, Opex, PMP, PMI, ECP, ECPM, C&SU, EHCP, Lean, GEP, GMP, Hazop, Hacp. Hazzp. Ehedg,
- 1 Jahr und 2 Monate, Okt. 2012 - Nov. 2013
Consultant Senior Projectmanager
Altran nv/sa
Setting up, Setting, monitoring and executing investment projects for the installations of Anheuser Busch Inbev in the area West Europe (Benelux, France and Germany). These tasks will be performed in the capacity of Consultant of the company Altran.
- 1 Jahr und 8 Monate, Feb. 2011 - Sep. 2012
Manager Projects
Hebold Mixing & More
As manager projects, among others, I am responsible for the optimal process from order intake up to comissioning of the orders. I am responsible for a positive cash flow in accordance with the calculations of VTK and its sister company Hebold in Cuxhaven. I am ensuring the optimal performance of the workflow management system and the introduction and implementation of this system at Hebold in Cuxhaven. Through the introduction of good procedures I provide added value in the process
- 1 Jahr und 8 Monate, Feb. 2011 - Sep. 2012
Manager Projects
van TongerenKennemer bv
• Managing as wel the team of projectmanagers as well the engineering department • Managing various global projects from engineering to commissioning for complete systems and elements in the field of food, pharma, cosmetics and oil and gas. • Implemented a new approach to work from orderintak up to commssioning at custommer sites. • Introduced a better workflow system to deal with projects from sales towards manufacturing at van Tongeren Kennemer bv.and Hebold with guidelines and procedures.
- 7 Monate, Sep. 2010 - März 2011
Projectmanager Development & Engineering
Revicon stainless steel solutions
· Managing the project to develop and create a production unit for producing latex medical (surgical) gloves. In this the system is a proto-type to produce 1 billion latex medical gloves a year. Eventually an entire factory in Malaysia has to operate at a capacity of 10 to 20 fold. (1 billion gloves only the English market). · I did manage the technical and process development of the total equipment.
- 2 Jahre und 2 Monate, Aug. 2008 - Sep. 2010
Senior International Project Manager
Meyn poultry processing solutions bv
· Managing orders from the customer in- and outside of Meyn. In Asia (India, Thailand, Malaysia, China) Germany, Belgium, Belarus, Australia and South Africa. · Project-size between 100.000 and 20.000.000 Euro not parts or spare-parts. · Average a Project manager deals with 12 to 15 projects a year. · Contracting, sale, designing, installation and start-up of poultry processing plants. · Examine the requirements and the targets of the customer, contract negotiations, start-up of the projec
- 4 Jahre und 1 Monat, Aug. 2004 - Aug. 2008
Manager development and sales
Advance Products as part of Parker Hannifin
· Responsible for development and sales of metal seals, valves and specials for non-catalog products. · Responsible for development and service of polymer seals. Special in favour of pneumatic valve systems for high powered racing engines. Specific racing engines in Formula 1. · Studies to infiltrate in other market for metal seals and seal systems. · Sales, application and cost responsible for metal-seals for all kind of use, e.g.: power plants, nuclear vessels, high vacuum, combustion engines, marine ap
- 4 Jahre, Sep. 2000 - Aug. 2004
Senior Development Engineer/System engineer
ASML Special Applications BV
Initiating new concepts and making use of new applications and technologies for lithographic systems. Controlling the project-plan, distribution of work, budgets and coaching of team members. Development of a system to provide substrates with DNA-strings. Patent granted.
- 9 Jahre und 1 Monat, Sep. 1991 - Sep. 2000
Lecturer in mechanical engineering
Hogeschool ’s-Hertogenbosch (Techn. Univ. B.Sc. Studies).
· Theory and workshops in Mechanical engineering, Industrial engineering and Civil engineering. · Co-ordinator application course cryogenics. · Implementing a complete CAE/CAD/CAM program (Unigraphics) in the university as an education tool in engineering. · Co-writer of the policy note “Design in an automated environment” aimed by the HBO council in 1994. · Technical computer applications.
- 6 Jahre und 3 Monate, Juli 1985 - Sep. 1991
Project leader, Module specialist electronics/mechanic for S.M.D. placement syst
Philips, I&E-AAA. (now Assembleon)
· Responsible for the development and routing from Performance specification up to the second produced series and release for production of component and PCB handling. · Responsible for the complete design. Responsible for the design quality of the systems. · Release for production of PCB transport and handling systems in flow-lines and systems. · Proposing improvements resulting in better performance for new and upgrading of present systems. · Team leader of 4 employees.
- 1 Jahr und 5 Monate, März 1984 - Juli 1985
Group leader/designer mechanical engineering
ing. adv. buro TAB in Helmond
Replacing the head of office when absence. Projects: - Investigation and inventory of CAD system for the company. - Design of tooling and dies for car manufacturing. Senior Designer. - Outsourced to Philips-CFT inside a multitasking project to develop a new electronic component placer. (components are leaded components like resistors, capacities, diodes, transistors). - Tooling designs for manufacturing processes.
- 4 Jahre und 1 Monat, März 1980 - März 1984
Designer/Project leader mechanical engineering
ing. adv. buro ADCO in Eindhoven
Responsible for the material logistics (piping materials) for a rebuild of a zinc-plant. From smelting to electrolyses. Designer Internal transport systems.
Ausbildung von Roelof Ritsema
- 1 Jahr und 11 Monate, Okt. 1989 - Aug. 1991
Precision engineering
Hogeschool Utrecht
Precision engineering (Mechatronics)
- 9 Monate, Okt. 1984 - Juni 1985
Education
Pedagogische Hogeschool Eindhoven
Education training
- 6 Jahre und 3 Monate, Aug. 1978 - Okt. 1984
Mechanical engineering
Hogeschool Eindhoven
Equipment design
Sprachen
Niederländisch
-
Englisch
Fließend
Deutsch
Fließend
Französisch
Grundlagen
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
