marcorosario cusmano

Angestellt, Manufacturing operation and MSAT Director, Merck Group
Bari, Italy

Fähigkeiten und Kenntnisse

FIDIC Red book
Assegnazione delle risorse
Contract Management
Problem Solving
FIDIC SIlver book
Controllo progetti
FIDIC yellow book
Project Management
Cost Management
Project Planning
Gestione contratti
Downstream Oil & Gas
R&D experience
Governance dei progetti
English
Key Performance Indicator
Risk Management
Leadership
Transportation
Management
Pensiero strategico
PMP
GMP Compliance
Compliance
Production
Production planning and control
Quality Management
Qualification
Validation
Process Engineering
PMP Certification
Health Safety Environment HSE
Controlling
Process Validation
Operation and Maintenance
Engineering
Packaging
Biotechnology and Pharmaceuticals
Aseptic Processing
People Management
People development
Talent Management
Cost reduction
Production engineering

Werdegang

Berufserfahrung von marcorosario cusmano

  • Current 7 months, since Dec 2025

    Steering Committee

    PDA - Parenteral Drug Association

    Steering committee member of the PDA Italian chapter.

  • Current 4 years and 7 months, since Dec 2021

    Manufacturing operation and MSAT Director

    Merck Group

    Lead manufacturing, aseptic filling, compounding, visual inspection, technology transfer and process improvement team of about 160 Merck employees. Volumes allocations, capacity management, Health Authorities inspections. Driver and role model for site.

  • 3 years and 2 months, Oct 2018 - Nov 2021

    Technical Services Director

    Merck Group

    For Merck Bari site (120,000 square meters) the Technical Service Director is responsible for all the technical operations. The Technical Services Directors manages a team of 80 Merck employees divided in the following team: Engineering, Maintenance, Automation & Digitalizion plant, Qualification, PMO Site team. He is responsible for OPEX (10 M€/year) and annual site capex (8-10 M€/year). In the site he also manages all the strategic investement projects (160 M€) in the site as: - New FD/Vial line u

  • 1 year and 1 month, Oct 2017 - Oct 2018

    Site Projects Head

    Merck Group

    The Site Project Head is responsible to manage the strategic investments projects in Bari site (budget aorund 100 M€) in the next five years. The main projects are: - New Fill & Finish building (2000 smq). - New production area dedicated to a new filling line under isolator for Vials and FD product. - New production area dedicated to a new filling line under isolator for cartridges product. - New Automatic warehouse - New Packaing area - New Visual inspection area The Site Project Leader is responsible t

  • 3 years, Oct 2014 - Sep 2017

    Engineering and maintenance manager

    GSK

    For GSK Siena site (140,000 square meters and 45 buildings) the engineering and maintenance manager is responsible for: Manage all maintenances activities Manage all the engineering investment project and modification of the existing plants Establish the guidelines of maintenance procedures Manage the annual maintenance and engineering budgets Guarantee the compliance of all the plant with the Italian law requirements and GSK standards Guarante the respect of all the HSEE requirements Manage all the ext

  • 11 months, Dec 2013 - Oct 2014

    Project Manager

    Ansaldo STS

    Project Manager for the tender of the new Light Rail Tram (LRT) of Aarhus. The EPC project consists in: Realization of ~14km new LRT line Realization of the 2 interconnections between the new LRT line and the existing railways Odder- Aarhus (south bound) and Aarhus- Grenaa (north east bound); Electrification of ~70 km section of the existing Aarhus-Grenaa Regional Railway and ~30 km section of the existing Odder-Aarhus Regional Railway; Conversion of the 2 existing regional Railway Lines into LRT line wi

  • 3 years and 7 months, Apr 2011 - Oct 2014

    Deputy Project Director

    Ansaldo STS

    Deputy Project Director for Cityringen project (700 M€): the project will deliver the new metro line in Copenhagen (aroud 17 Km + depot). Project Manager to deliver the depot of the metro included in the Cityringen project. Project Manager to deliver the Traction Power/Power Supply system of the Cityringen project. Project Manager to deliver the Signaling system of the Cityringen project. Construction Risk Manager of the Cityringen project.

  • 2 years and 3 months, Jan 2009 - Mar 2011

    Project Manager

    Eni

    Lombardia Methane project. The project (around 50 M€) had the objective to deliver the methane in 30 fuel distribution’s areas in Lombardia

  • 10 months, Mar 2008 - Dec 2008

    Deputy Project Manager

    Eni

    Green diesel project. The project (around 200 M€) had the objective to built new refinery plant to treat vegetable oil to produce gasoline and diesel.

  • 8 months, Aug 2007 - Mar 2008

    Project control

    Eni

    Green diesel project. The project (around 200 M€) had the objective to built new refinery plant to treat vegetable oil to produce gasoline and diesel.

Ausbildung von marcorosario cusmano

  • 2020 - 2020

    Merck Leadership and culture program

    IMD Business School

  • 2006 - 2007

    Master of Business Administration (MBA)

    Enrico Mattei school - Eni group

  • 2005 - 2009

    Doctor of Philosophy (Ph.D.)

    Università degli Studi di Roma 'La Sapienza'

  • 1999 - 2005

    MSc (MEng.) Mechanical Engineering

    Università degli Studi di Roma 'La Sapienza'

Sprachen

  • English

    C1 (Fließend)

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 21 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z