
Cavan Cleary
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Cavan Cleary
- Bis heute 7 Jahre und 4 Monate, seit Feb. 2018
Co-owner at NSH//Owner at Cleary Boar LLC
NSH
- 1 Jahr und 3 Monate, Jan. 2013 - März 2014BP Europa SE
Operations Team Leader/Production Superintendent
- 11 Jahre und 7 Monate, Mai 2001 - Nov. 2012
Plant Superintendent
Wintershall Dea GmbH
I returned to Libya after the Revolution to resume my previous position with Wintershall until 2012.
- 8 Monate, März 2011 - Okt. 2011
Commissions Specialist
Global Commissioning Solutions
Clients: 1. NuVista Martin Creek Gas Plant, BC, Canada - Emission upgrade project. Trouble-shooting the new installation of jet nozzels on TEG still overheads. 2. Assam O&G Amguri Plant expansion, Jorhat, India. - 10 day engineering tour to assess a project recently halted. Never did restart as ownership take-over delays continue. 3. Pembina Musreau Gas Plant, Alberta, Canada - Commissioning Team for client installation pf deep cut facilities on existing trains.
- 4 Jahre und 9 Monate, Juni 2006 - Feb. 2011
Plant Superintendant
Wintershall - Lybia Concession 97
30 000 bopd Oil & Gas pipelines and separation plant (3) Manage team of 25 operators and day-to-day management of camp facilities and construction projects. Constantly growing place for the 5 years with regular planned maintenance shutdowns, water handling expansions, boiler and heating system upgrades, DCS upgrades, plant debottlenecking, Water Injection Construction/commissioning and camp expansions.
- 5 Jahre und 2 Monate, Mai 2001 - Juni 2006
Production Dayshift Leader
Wintershall - Libya, Concession 96
120 000 bopd Oil & Gas processing plants Electrostatic precipitation Dehyd/Desalt. 110 MMScfd Gas/10,000 bpd Liquids Utilization plant 4-Stage recip propane refrige system. Power by 7 turbines ~ 6 MW each Seimens S7 DCS control system Frequent expansions, debottlenecking and DCS upgrade
- 1997 - 2001
Plant Shift Leader
AEC oil & Gas/EnCana
170 MMScfd Sour Gas and Liquid Processing, with 200 MMScfd Underground Storage Plant (four trains - 1 dry sour gas, 1 wet sweet gas, 1 Storage/Withdrawal) Sulfur Plant: Modified Claus with Sub-Dewpoint TGCU (120 Tonnes/day)
- 6 Jahre und 6 Monate, Nov. 1990 - Apr. 1997
Shift Engineer 1
Westcoast Energy Inc (now Spectra Energy)
Pine River Gas Plant 560 MMScfd Sour gas processing w/2000 LT/D Sulphur production (3 trains from one common inlet ~ 13% H2S, 9% CO2) Sulfinol-D gas sweetening TEG Gas Dehydration (previously solid bed desiccant) Sulfur plants by Modified Claus sub dewpoint TGCU Steam process heat (Waste Heat and ngas power boilers) Electricity by turbines, recips, steam turbine. Honeywell TDC 2000/3000 DCS
- 5 Jahre und 4 Monate, Mai 1982 - Aug. 1987
Millworker
Canadian Forest Production
Worked in various floor position in sawmill and planer locations. Most of the time spent in outside operation rail cars.
Commissioning/Leading Operator
Westcoast Gas Services Inc
Highway Sour Gas and Liquids Plant 121 Alaska Highway 120 MMScfd. 3000 bpd HC liquids. MDEA sweetening Frac plant producing Hd-40 quality propane Hired on as Lead Operator during green field construction phase. Assisted plant manager in hiring ops/maintenance team and follow through commissioning to start up setting out period.
Sprachen
Englisch
Muttersprache
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
22 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.