Ferhat Sinan Çavdar
Skills
Timeline
Professional experience for Ferhat Sinan Çavdar
- Current 1 year and 7 months, since Sep 2024
E&I Commissioning Superintendent
Calık Enerji
Led E&I commissioning and pre-commissioning, including loop checks, motor runs, panel testing (MV/LV/UPS), and system commissioning (DCS, ESD, instrumentation). Developed commissioning plans, coordinated with disciplines, ensured HSE/PTW compliance, and managed vendor testing. Supported TOP walkdowns, handover, and consortium/site planning to align construction with commissioning priorities
- 4 months, Jun 2024 - Sep 2024
Instrument Supervisor
Tecnicas Reunidas
Sasa New PTA Project (Adana, Turkey) Led instrumentation preparations for start-up, facilitating interdisciplinary collaboration for system completion. Led Construction and Mechanical Completion team in conducting essential inspections. Mechanical Completion Punch List Closure.
- 2 years and 5 months, Jan 2022 - May 2024
Managing Director
Designful Market
Startup Project - E Commerce Website (London, England - Remote) Establish company goals and objectives. Develop business plans and strategies.
- 2 years and 4 months, Oct 2019 - Jan 2022
E&I Supervisor
Tecnicas Reunidas
Hawiyah & Haradh Gas Production Plants Project (Haradh, Saudi Arabia) Oversaw and coordinated electrical and instrumentation construction activities. Facilitated cross-disciplinary collaboration for construction activities. Implemented QA/QC procedures and oversaw inspections.
- 4 months, Jul 2019 - Oct 2019
E&I Supervisor
Petrofac
Turkstream Receiving Terminal Project (Kiyikoy, Turkey) Led E&I preparations for pre-comissioning activities and start-up. Led facilitating interdisciplinary collaboration for system completion.
- 5 months, Feb 2019 - Jun 2019
Instrumentation and Control Engineer
Tekfen Engineering
Data Gathering for HAOR Project (Baku, Azerbaijan) Data gathering for Modernization of Heydar Aliyev refinery. Facilitated cross-disciplinary collaboration for engineering activities. To prepare instrumentation and control projects (data-sheets for field instruments (transmitters,valves, gauges etc.), instrument lists and I/O lists, instrument and instrument air location plans, JBs wiring and vessel sketch.).
- 2 years and 2 months, Jan 2017 - Feb 2019
Commissioning Engineer
Gap Insaat
Fertilizer Project (Garabogaz, Turkmenistan) Directed E&I pre-commissioning and start-up operations. *Executed panel testing (433V, AC/DC UPS). *Performed motor solo and mechanical run tests. *Monitored and controlled transmitters and valves via DCS and ESD systems. *Conducted control valve stroke tests. *Conducted I/O checks and interlock/sequence verifications. *Troubleshooted field instrumentation and control cabinets during pre-commissioning and commissioning phases.
- 11 months, Nov 2015 - Sep 2016
E&I Site Engineer
Prizma Industrial
Watan 254 MW Simple Cycle Gas Turbine Power Plant Oversaw E&I construction activities, including instrument calibration, installation of GE equipment and transformers, cable pulling, isolation and continuity testing, cable glanding and termination (high and low voltage), and electrical heat tracing. Oversaw E&I pre-commissioning activities, including loop checks and panel testing. Facilitated cross-disciplinary collaboration for construction activities. Implemented QA/QC procedures and oversaw inspections.
- 1 year and 2 months, Oct 2014 - Nov 2015
E&I Site Engineer
Prizma Industrial
504.4 MW Simple Cycle Gas Turbine Plant (Derweze, Turkmenistan) Executed E&I construction activities including installation of GE equipment, transformers, and instrumentation. Managed cable pulling, isolation and continuity testing, cable termination (high and low voltage), and electrical heat tracing. Implemented QA/QC procedures and oversaw inspections.
- 1 year and 2 months, Oct 2014 - Nov 2015
E&I Site Engineer
Prizma Industrial
Tupras Resid Upgrade Project (Izmit, Turkey) Executed cable pulling, panel and instrument installation, junction box and hook-up installation, and instrument cable testing and termination. Implemented QA/QC procedures and oversaw inspections. Prepared loop documentation. Managed instrumentation pre-commissioning activities, including loop testing and monitoring of transmitters and valves on DCS and ESD systems. Generated project reports.
Educational background for Ferhat Sinan Çavdar
- 4 years and 10 months, Sep 2008 - Jun 2013
Electrical-Electronic Engineering
Kahramanmaras Sutcu Imam University
Languages
English
Intermediate
XING members with similar profiles
XING – The jobs network
Over 1 million jobs
Find just the right job for you on XING.
Job offers just for you
Get found by employers and over 20,000 recruiters.
21 million members
Connect with new people and gather inspiration to boost your working life.
Free membership
Basic membership is free, but the opportunities are priceless.