Navigation überspringen

Ferhat Sinan Çavdar

Angestellt, Instrument Supervisor, Tecnicas Reunidas

Fähigkeiten und Kenntnisse

Construction
Start-up
Engineering
Management
Electrical Engineering
Site management
Construction site
MS Office
Commissioning
Refineries
Team work

Werdegang

Berufserfahrung von Ferhat Sinan Çavdar

  • Bis heute 1 Jahr und 1 Monat, seit Juni 2024

    Instrument Supervisor

    Tecnicas Reunidas

    Sasa New PTA Project (Adana, Turkey) Led instrumentation preparations for start-up, facilitating interdisciplinary collaboration for system completion. Led Construction and Mechanical Completion team in conducting essential inspections. Mechanical Completion Punch List Closure.

  • 2 Jahre und 5 Monate, Jan. 2022 - Mai 2024

    Managing Director

    Designful Market

    Startup Project - E Commerce Website (London, England - Remote) Establish company goals and objectives. Develop business plans and strategies.

  • 2 Jahre und 4 Monate, Okt. 2019 - Jan. 2022

    E&I Supervisor

    Tecnicas Reunidas

    Hawiyah & Haradh Gas Production Plants Project (Haradh, Saudi Arabia) Oversaw and coordinated electrical and instrumentation construction activities. Facilitated cross-disciplinary collaboration for construction activities. Implemented QA/QC procedures and oversaw inspections.

  • 4 Monate, Juli 2019 - Okt. 2019

    E&I Supervisor

    Petrofac

    Turkstream Receiving Terminal Project (Kiyikoy, Turkey) Led E&I preparations for pre-comissioning activities and start-up. Led facilitating interdisciplinary collaboration for system completion.

  • 5 Monate, Feb. 2019 - Juni 2019

    Instrumentation and Control Engineer

    Tekfen Engineering

    Data Gathering for HAOR Project (Baku, Azerbaijan) Data gathering for Modernization of Heydar Aliyev refinery. Facilitated cross-disciplinary collaboration for engineering activities. To prepare instrumentation and control projects (data-sheets for field instruments (transmitters,valves, gauges etc.), instrument lists and I/O lists, instrument and instrument air location plans, JBs wiring and vessel sketch.).

  • 2 Jahre und 2 Monate, Jan. 2017 - Feb. 2019

    Commissioning Engineer

    Gap Insaat

    Fertilizer Project (Garabogaz, Turkmenistan) Directed E&I pre-commissioning and start-up operations. *Executed panel testing (433V, AC/DC UPS). *Performed motor solo and mechanical run tests. *Monitored and controlled transmitters and valves via DCS and ESD systems. *Conducted control valve stroke tests. *Conducted I/O checks and interlock/sequence verifications. *Troubleshooted field instrumentation and control cabinets during pre-commissioning and commissioning phases.

  • 11 Monate, Nov. 2015 - Sep. 2016

    E&I Site Engineer

    Prizma Industrial

    Watan 254 MW Simple Cycle Gas Turbine Power Plant Oversaw E&I construction activities, including instrument calibration, installation of GE equipment and transformers, cable pulling, isolation and continuity testing, cable glanding and termination (high and low voltage), and electrical heat tracing. Oversaw E&I pre-commissioning activities, including loop checks and panel testing. Facilitated cross-disciplinary collaboration for construction activities. Implemented QA/QC procedures and oversaw inspections.

  • 1 Jahr und 2 Monate, Okt. 2014 - Nov. 2015

    E&I Site Engineer

    Prizma Industrial

    504.4 MW Simple Cycle Gas Turbine Plant (Derweze, Turkmenistan) Executed E&I construction activities including installation of GE equipment, transformers, and instrumentation. Managed cable pulling, isolation and continuity testing, cable termination (high and low voltage), and electrical heat tracing. Implemented QA/QC procedures and oversaw inspections.

  • 1 Jahr und 2 Monate, Okt. 2014 - Nov. 2015

    E&I Site Engineer

    Prizma Industrial

    Tupras Resid Upgrade Project (Izmit, Turkey) Executed cable pulling, panel and instrument installation, junction box and hook-up installation, and instrument cable testing and termination. Implemented QA/QC procedures and oversaw inspections. Prepared loop documentation. Managed instrumentation pre-commissioning activities, including loop testing and monitoring of transmitters and valves on DCS and ESD systems. Generated project reports.

Ausbildung von Ferhat Sinan Çavdar

  • 4 Jahre und 10 Monate, Sep. 2008 - Juni 2013

    Electrical-Electronic Engineering

    Kahramanmaras Sutcu Imam University

Sprachen

  • Englisch

    Gut

XING – Das Jobs-Netzwerk

  • Über eine Million Jobs

    Entdecke mit XING genau den Job, der wirklich zu Dir passt.

  • Persönliche Job-Angebote

    Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.

  • 22 Mio. Mitglieder

    Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.

  • Kostenlos profitieren

    Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.

21 Mio. XING Mitglieder, von A bis Z