
Roberto Costa
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Roberto Costa
- Current 3 years and 5 months, since Feb 2023
Oil and Gas Exploration
HOLBORN Europa Raffinerie GmbH
Engineer/Manager for installation, pre-commissioning, commissioning and decommissioning of offshore pipelines and umbilicals. • Perform Project Engineering, planning and management. • Representing Client interests throughout project execution process from engineering to execution offshore. • Development and distribution of technical documents. • Chevron’s Ballymore. Senior Project Engineering for Pre-commissioning of subsea flowlines and umbilicals.
- 4 years and 11 months, Jan 2011 - Nov 2015
Offshore Field Representative
Fieldwood Energy
• Acting as the COMPANY rep offshore for the Orlov and Katmai Subsea Development Project, whilst managing and coordinating Topside to Subsea Construction and support of subsea URF operations. • Supervised the Installation Sub-Contractors and the offshore work force onboard the platform from pre-commissioning to commissioning tasks. • Lead teams to ensure the project is delivered and carried out as efficiently, effectively and safely as possible whilst endeavoring to meet timescale deadlines.
- 7 years, Dec 2006 - Nov 2013
Senior Project Engineer
Allseas
• Performed pre-commissioning and installation engineering with SURF (Subsea, Umbilicals, Risers, and Flowlines) projects. * Prepared relevant scopes of work and specifications for tenders and projects offshore. • Provided technical support and guidance to other team members; Assisted engineer in the installation phase. • Assist in coordination of interfacing activities with subcontractors/vendor, clients and third parties throughout the project life cycle.
• Wrote and reviewed procedures to complete project work scope; Mobilized to project location when called upon. • Project Engineered/Managed the following: • Kitan Field Development- Technip to pre-commission subsea umbilicals and flowlines offshore: Timor/Australia. • Gladden project- Paloma to commission subsea umbilical offshore: Gulf of Mexico. • Anduin project- Helix & Bluewater to pre-commission subsea umbilical offshore: Gulf of Mexico
•Performed field service at different locations to service or start up the company’s equipment for their customers; equipment included Interface Detectors, Multi-Phase Flow Meters, and Oil and Water Cut Meters. • Reviews performance reports and documentation from customers and field representatives and inspects malfunctioning or damaged product to determine nature and scope of problem. • Analyzes findings to determine source of problem, and recommends repair, replacement, or other corrective action.
- 5 years and 10 months, Feb 1992 - Nov 1997
Pipping Designer
Eni
Assign to Bombay India for direct involvement of design and investigation for the carry-over works, for the hook-up and commissioning of topside modular oil and gas production facilities. Work with Atlantic Gulf & Pacific Co. Manila Philippines. In various capacities has been involved in engineering design of detailed structural and piping fabrication, erection drawings: Project Title: South Bassein Phase II, BPB Platform for Oil and Natural Gas (Offshore) Commission of India through Snamprogetti, Italy
Ausbildung von Roberto Costa
- 4 years and 9 months, Feb 1987 - Oct 1991
Geophysics
Sapienza University of Rome
Sprachen
Italian
A1-A2 (Grundkenntnisse)
English
B1-B2 (Gute Kenntnisse)
German
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
