
Leandro Arias Galicia
Fähigkeiten und Kenntnisse
Werdegang
Berufserfahrung von Leandro Arias Galicia
- Bis heute 10 Monate, seit Juni 2025
Director of Project Development
GEAC Engineering Solutions
Owned end-to-end project workstreams from early definition to execution, coordinating multiple stakeholders engineering, suppliers, procurement and clients). Led cross-functional teams to deliver complex projects on time and within quality standards, applying Agile rinciples and structured project management. Supported decision-making through data analysis, risk assessment and performance tracking during early project stages. • Acted as main interface between technical teams and external partners, alignin
- 1 Jahr und 10 Monate, Sep. 2023 - Juni 2025
Electrical Specialist – Project Development
Exceltic
Develop the relationships with EPCs, offering technical insights and solutions aligned with client need. Lead the electrical design and engineering of PV, BESS and PE projects, focusing on high voltage infrastructure, substations (MV/HV), and grid interconnections. Review and develop and review single-line diagrams, protection schemes, grounding systems, and equipment specifications. Coordinate with project developers, utilities, and EPC contractors to ensure compliance with grid codes and technical standar
- 2 Jahre und 4 Monate, Jan. 2021 - Apr. 2023
Sr. Project Manager
Nalco Water, An Ecolab Company
Main Responsibilities: Responsible for applying proprietary Ecolab technologies, developing and managing projects for automation of dosing systems for chemical water treatment, in industrial processes, ETA, ETE, boiler and cooling tower. Interaction in industrial processes of clients in Mining, Pulp and Paper, Water Treatment, Pharmaceutical, Food, Energy, Oil industries. Preparation of technical specifications, drawing and planning details, respecting norms and regulations, as well as safety standards.
- 2 Jahre und 11 Monate, Okt. 2018 - Aug. 2021
System Application Specialist II
Nalco Water, An Ecolab Company
Help Desk for Latin America - SYSTEM APPLICATION SPECIALIST Working at the NALCO Latin America help desk, I’m responsible of providing technical support to our workers in the field, in three different language, My main duties are: Provide support to rotary services of Representatives of Vendas in strategic district accounts to execute agreed plans of guarantee of systems for two clients and continuous melhoria Assistant to Sales Representatives with field investigations in potential clients Working with
- 1 Jahr und 4 Monate, Dez. 2015 - März 2017
Senior Project Coodinator
Institute of State Railways
Project: Modernization of billing systems Main activities carried out: - Responsible for planning, designing, coordinating and controlling customer service and after-sales service, as well as promoting continuous improvements and updates of marketed products. -Coordination of projects for electrical installations, equipment, and servers of all user control and access systems on the trains of all IFE railroad systems. - Responsible for customer contact and management during the sales and after-sales proc
- 4 Monate, Sep. 2015 - Dez. 2015
Internship in the electrification unit
Institute of State Railways
Project: Updating electric power backup systems
- 1 Jahr und 8 Monate, Mai 2013 - Dez. 2014
Electrical Installations Specialist
Metro of Caracas C.A
Project: Modernization of line 1 of the Caracas Metro Main activities carried out: - Analyze facilities projects and ensure that they meet the premises established by the projects and operations area before the start of execution - Responsible for installation activities, fault detection and fiber optic repair within the railway system. - Responsible for the planning, management and control of the installation and / or maintenance activities of the company's products. - Contribute to the achievement of th
- 1 Jahr und 2 Monate, März 2012 - Apr. 2013
Technician Installation
Institute of State Railways
Project: Adaptation to the signaling system. Signaling installation technician. Main activities carried out: - Carry out installation activities, contributing to the achievement of the goals. - Conduct regular equipment inspections. - Responsible for the inspection and operation of telephone systems and equipment or data networks. - Responsible for the verification of test protocols. - Ensure the commissioning of all facilities and complete technical alignment with our internal consultants;
Ausbildung von Leandro Arias Galicia
- Bis heute 2023 - 2027
Doctor of Philosophy - PhD
Universidade Estadual de Campinas
- 2019 - 2023
Master's degree
Universidade Estadual de Campinas
- 2010 - 2017
Degree in Electrical Engineering
Universidad Central de Venezuela
XING Mitglieder mit ähnlichen Profilangaben
XING – Das Jobs-Netzwerk
Über eine Million Jobs
Entdecke mit XING genau den Job, der wirklich zu Dir passt.
Persönliche Job-Angebote
Lass Dich finden von Arbeitgebern und über 20.000 Recruiter·innen.
21 Mio. Mitglieder
Knüpf neue Kontakte und erhalte Impulse für ein besseres Job-Leben.
Kostenlos profitieren
Schon als Basis-Mitglied kannst Du Deine Job-Suche deutlich optimieren.
